Laserfiche WebLink
Item No. 26 <br />Memorandum <br />TO: Mayor, Mayor Pro -Tem & City Council <br />Grayson Path, City Manager <br />FROM: Paul Strahan, Airport Manager/FBO Operator <br />SUBJECT: Engineering Design / Runway Rehabilitation / Improving Taxiway and <br />Possible Apron <br />DATE: December 12, 2022 <br />BACKGROUND: TXDOT visited the airport in 2019 and determined the primary runway, <br />primary taxiway, taxiway connectors, and apron were in need of rehabilitation. Currently, we are <br />preparing for the design portion of the project and TXDOT requires funding approval for the <br />overall project in the form of a resolution prior to this work being accomplished. <br />STATUS OF ISSUE: Total cost of the proposed runway project at Cox Field is $2.94M and will <br />be funded by a grant which is a 90% - 10% match with the city responsible for 10% of the total <br />cost, $294,000. The project will start with the rehabilitation of the runway, then will move to the <br />taxiway and connectors and then to the apron as funds permit. The 10% match the city provides <br />for this project will be coming from ARPA, American Rescue Plan Act, funding, which has been <br />set aside for this purpose. TXDOT requires funding be approved in the form of a resolution in <br />order to move forward with the Runway Project at Cox Field. <br />BUDGET: $294,000 (of ARPA funds) <br />RECOMMENDATION: <br />Options: <br />1. Approve a resolution for the funding of the runway rehabilitation, taxiway, taxiway <br />connectors and apron project. <br />2. Do not approve a resolution for funding this and lose the grant to rehabilitate the runway, <br />taxiway, taxiway connectors and apron. <br />Staff recommends approving the resolution for the funding for the grant to rehabilitate the runway, <br />taxiway, taxiway connectors and apron. <br />