My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
28 - Amendment of Fee Schedule for Building Permitting - Planning and Zoning - PUblic Works - Engineering -Fire Marshal Department
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
12 - DECEMBER
>
12-12-2022
>
28 - Amendment of Fee Schedule for Building Permitting - Planning and Zoning - PUblic Works - Engineering -Fire Marshal Department
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2022 10:57:34 AM
Creation date
12/9/2022 10:37:51 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. <br />Clean & Show <br />. <br />$5000 <br />3. <br />............................ <br />Temporary Certificate of Occupancy <br />...... <br />... _ .. . _ . <br />$150.00 <br />Signs <br />1. <br /><50 sgft (singlesided or re -face) <br />$50.00 <br />2. <br />�_.�................................ <br /><50 s qft double sided) <br />......-_._.. <br />$75.00 <br />3. <br />>50 sq.ft ..(.sin_..g_le.....s....i..d.ed or re -face) <br />..... <br />$100.00 <br />q, <br />>50 sqft (double sided) <br />_.m...... w_ _... <br />$150.00 <br />S. <br />Monument Sign <br />$200.00 <br />6. <br />Fla..... <br />gs & Banners (Temp Signs) <br />$75.00 <br />7. <br />_._..._ <br />Billboards <br />............. <br />$500.00 <br />8. <br />Billboard Annual Registration <br />$100.00 <br />9. <br />_...._. _.._... <br />Sign Recovery _._._._._ -..._ <br />$25.00 <br />........ <br />Misc Building Department Permits <br />- .................._..........._ - ........ <br />_ . .�.......... <br />��� ..._ <br />1. <br />Solar System <br />$50.00 <br />2. <br />Moving (building)$100.00 <br />per building <br />3.Construction <br />............ <br />Trailer <br />$100.00 <br />4. <br />Demolition <br />-. <br />_._ <br />$50.00 <br />S. <br />Temp Pole Electric <br />$50.00 <br />ID t <br />1. <br />Site Plan Review_ <br />25% of Permit Fee <br />2. <br />Site Permit & Engineering fee <br />3% of job cost <br />3. <br />Grading Permit$250.00 <br />4. <br />.... _m......... _... <br />ClearingPermit (tree removal) <br />_ w <br />........ ........ <br />$200.00 <br />_ w.. <br />Right of <br />of Way (RoW) - Working in Right <br />......._ .- <br />$100.00 <br />5. <br />W <br />Way <br />414///4/"/,,A//SL � ,, , <br />Water <br />1. <br />Standard 1" - in pavement <br />$1790.00 <br />2. <br />Standard m1"mm-mmin soil (same s ide) <br />mmITITITITmm WW <br />$890.00 <br />3. <br />Standard 2" - in pavement <br />$2610.00 <br />4.Standard <br />2" - soil (same side) <br />$1900.00 <br />5 . <br />Split Se ............. <br />Service - in pavement <br />............_....... _..__ <br />$2610.00 <br />6. <br />Split Service - soil (same side) <br />.... ... ...�..................... <br />$1100.00 <br />7. <br />5 & 5 Program <br />See Policy <br />Sewer <br />1. <br />Standard 4" - in pavement <br />$2260.00 <br />2. <br />Standard 4" - in soil (same side) <br />$800.00 <br />3. <br />.............. <br />Standard 6" - in pavement <br />e <br />$2500.00 <br />4 <br />�� ® <br />Standard 6 soil (same side) <br />......_................ <br />$1000.00 <br />5. <br />Split Service - in pavement <br />$2210.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.