My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 - Street Materials
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
03 - MARCH
>
March 13
>
06 - Street Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 4:53:54 PM
Creation date
3/9/2023 4:47:32 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 6 <br />TO: Mayor, Mayor Pro -Tem & City Council <br />Grayson Path, City Manager <br />FROM: M.A. Smith, Public Works Director <br />Mike Wade, Streets Department Superintendent <br />SUBJECT: STREET MATERIALS 2023-2024 BID <br />DATE: March 13, 2023 <br />BACKGROUND: This is the annual bid for roadway materials to be used by the Street, Water <br />Distribution, Sewer Maintenance, and Parks Divisions. The materials competitively bid include <br />Aggregate Cover Stone (Type B, Grade 4, Uncoated); CRS -2 Emulsion Asphalt; HMAC (Hot Mix <br />Asphalt Concrete) Type D; Hot Mix Cold Laid Asphalt, "Type "A" (Coarse Base) Material; Hot <br />Mix Cold Laid Asphalt, Type `B" (Fine Base) Material; Hot Mix Cold Laid Asphalt, Type "D" <br />(Fine Mixture) Material; Portland Cement Concrete "Class A" (5 sack); Portland Cement Concrete <br />"Class C" (6 sack); Portland Cement Grout 5 sack; Portland Cement Grout 6 sack; Flexible Base <br />Material (Red Rock) Type A; SS -1 Emulsion Asphalt (Tack Oil); Sand; Top Soil; Flexible Base <br />Material (White Rock). <br />STATUS OF ISSUE: The City of Paris Public Works Department has received sealed bids for <br />street materials on March 7, 2023, and would like to award bids to the lowest responsible bidders <br />for each material. The bid tabulation sheet is attached for details of the bids and materials, with <br />low bids highlighted. The contract period is April 1, 2023 through March 31, 2024. <br />BUDGET: Funding is budgeted in the various Public Works Departments. <br />RECOMMENDATION: Award bids as indicated in attachment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.