My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-025 - Development Agreement with Lionshead Paris LLC
City-of-Paris
>
City Clerk
>
Resolutions
>
2023
>
2023-025 - Development Agreement with Lionshead Paris LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2023 12:48:09 PM
Creation date
5/31/2023 9:45:29 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: OEE9F589-5B05-4961-9ACA-5229871D54CE <br />serve both the Developer's Facility via lateral connections as well as future development <br />of the Industrial Park to be constructed on land within the Industrial Park owned by the <br />Paris Economic Development Corporation located further west and south of the Facility. <br />2.8 The City and Developer (the °Parties") have agreed that the City will <br />construct the Public Line in lieu of the previously planned Private Line, and that Developer <br />will pay City a contribution to the public line as calculated in Paragraph 2.9 herein <br />according to the schedule set forth in Paragraph 4.1 herein. <br />2.9 For the purposes of this Agreement, City engineering staff has compiled the <br />following estimated costs: <br />I. Cost of the previously planned Private Line: FIVE HUNDRED EIGHTY-SIX <br />THOUSAND THREE HUNDRED AND ONE DOLLARS AND 15/100 <br />CENTS ($586,301.15). See the Preliminary Opinion of Probable <br />Construction Cost attached hereto as Exhibit B and incorporated herein by <br />reference. <br />ii. Developer's Cost of the lateral lines and related improvements necessary <br />to connect to the Public Line (the "Lateral Lines") for Developer's water and <br />fire flow needs as required in the building and fire codes, and in lieu of the <br />previously planned Private Line: THREE HUNDRED THIRTY-FIVE <br />THOUSAND SEVEN HUNDRED TWENTY-SEVEN DOLLARS AND <br />071100 CENTS ($335,727.07). See the Preliminary Opinion of Probable <br />Construction Cost attached hereto as Exhibit C and incorporated herein by <br />reference. <br />Ill. The above estimates are based on known market values as of the signing <br />of this Agreement. Developer agrees with these estimates for the purposes <br />of this Agreement. In an effort to simplify this Agreement and to provide <br />certainty in the cost allocation between the Parties, the Parties agree to use <br />same for the purposes of calculating Developer's contribution to the <br />construction of the Public Line set forth in paragraphs 2.9.iv and 4.1. <br />iv. The net difference between estimates for the previously planned Private <br />Line (Exhibit B) and the estimated cost to Developer of the Lateral Lines <br />(Exhibit C) is TWO HUNDRED FIFTY THOUSAND FIVE HUNDRED <br />SEVENTY-FOUR DOLLARS AND 08/100 ($250,574.08), which amount <br />shall be Developer's contribution to the construction of the Public Line. <br />2.10 The City Council of the City of Paris has found that construction of the Public <br />Line constitutes a public purpose in that it will support the construction of Developer's <br />Facility and the capital investment and job creation associated therewith as well as future <br />growth and development in the Industrial Park. <br />
The URL can be used to link to this page
Your browser does not support the video tag.