My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 - Grand Avenue Sidewalk Extension
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
06 - JUNE
>
June 12
>
15 - Grand Avenue Sidewalk Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2023 1:42:49 PM
Creation date
6/8/2023 1:42:36 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 15 <br />TO: Mayor <br />Mayor Pro Tem <br />City Council <br />FROM: Todd Mittge, City Engineer <br />SUBJECT: Grand Avenue Sidewalk Extension <br />DATE: June 12, 2023 <br />BACKGROUND: The City would like to partner with two commercial property owners to widen <br />the sidewalk on the south side of Grand Avenue, near the 1St Street SW Intersection, adjacent to <br />the 107 Grill and the Mustard Seeds Boutique. This proposal would expand the existing sidewalk <br />approximately 8 feet wide and 68 feet long. This will allow room for al fresco dining at the <br />restaurant, and additional display room in front of the boutique with extra space for pedestrians to <br />pass unobstructed on a new, stamped and stained concrete sidewalk. The two travel lanes of Grand <br />Avenue would remain in their current positions and widths. The preliminary estimate for this <br />construction project is $28,300. City Staff has met with the two property owners adjacent to the <br />project, John House and John Bratcher. The property owners have verbally agreed to help pay for <br />part of construction with a combined contribution of $8,638.00. <br />We would like to enter into an agreement with Hayter Engineering, Inc. to provide Survey and <br />Design Services for this project. Survey and Design Fees to provide plans and specifications for <br />the Bidding of this work is $14,900.00. <br />We would like the Council's permission for Grayson Path, City Manager to enter into this <br />agreement with Hayter Engineering, Inc. <br />STATUS OF ISSUE: Staff has reviewed the agreement, exhibits and believe it is a long <br />term benefit to the City and its residents. This is being presented to the City Council for <br />consideration. <br />BUDGET: $14,900 in funding for the Survey and Design services will be paid for out of the <br />existing Engineering Budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.