My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 - Grand Avenue Sidewalk Extension
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
06 - JUNE
>
June 12
>
15 - Grand Avenue Sidewalk Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2023 1:42:49 PM
Creation date
6/8/2023 1:42:36 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES <br />TO BE PROVIDED BY HAYTER ENGINEERING, INC. <br />TO <br />CITY OF PARIS <br />FOR <br />GRAND STREET (107) SIDEWALK DESIGN <br />A. PROJECT DESCRIPTION <br />The CITY proposes to construct a concrete "bump out" and reconstruct existing <br />sidewalk located at the southwest corner of Grand and 1St SW Streets. More <br />specifically, the project area will be located on the south side of Grand Street directly in <br />front of Mustard Seed Boutique and 107 Grill. Services by the CONSULTANT shall <br />include all aspects of the work set forth in the following scope of services. <br />B. TASK DESCRIPTIONS — SCOPE OF SERVICES <br />SurveyPhase Services ($2,500) <br />1. Hayter Engineering will provide field surveying services necessary to <br />develop construction plans for the proposed project. The purpose of the <br />survey is to gather enough information to design the proposed sidewalk <br />improvements. These services shall include: <br />a. Establish GPS based survey control points to be used for the <br />development of this site. <br />i. Control points shall be an X cut in the existing concrete <br />sidewalk. <br />ii. Location will be based on Texas State Plane Coordinate <br />System Zone 4202 NAD 1983 and will be established by <br />GPS observations. <br />iii. Elevation datum will be NAVD 1988 (also City datum) and <br />will be established by GPS observations and conventional <br />level work. <br />b. Topographic field survey needed in order to develop construction <br />plans and show existing features of the site to include the area of <br />the proposed bump -out, existing sidewalk and features, and <br />subsurface utilities that are marked by Texas 811. <br />Desion Phase Services ($12,400 <br />1. Development of the design including plans and technical specifications up <br />to a 90% completion level. <br />a. The City shall provide Hayter Engineering with relevant information <br />regarding their Downtown Plan as it affects this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.