My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 - Grand Avenue Sidewalk Extension
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
06 - JUNE
>
June 12
>
15 - Grand Avenue Sidewalk Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2023 1:42:49 PM
Creation date
6/8/2023 1:42:36 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CONSULTANT shall perform the necessary engineering and related <br />technical services for the Design, including necessary Additional Services for <br />development of this Project according to the following sections of this Contract. <br />Special Services <br />1. Additional Services <br />The following additional services are beyond the scope of services <br />described above. However, the Consultant can provide the additional <br />services, if needed, upon the City's written request. Any additional <br />amounts paid to the Consultant as a result of any material change to the <br />scope of the project shall be agreed upon in writing by both parties before <br />the services are performed. The additional services include, but are not <br />limited to, the following: <br />a. Changes to the proposed project layout. <br />b. Additional design, bidding, or construction services not specified in <br />Exhibit A. <br />c. TxDOT coordination, review, approval, permitting, and/or <br />communication. <br />d. Bid phase services. <br />e. Construction phase services <br />f. Traffic Control Plan. <br />g. Research, coordination, or data collection pertaining to the City's <br />Downtown Plan. <br />h. Improvements outside the project limits. <br />i. Communication with property owners (written or oral). <br />j. Additional meetings, addenda, pay requests, change orders, and <br />site visits not specified in Exhibit A. <br />k. Geotechnical services. <br />I. Environmental services. <br />m. Historical and archeological services. <br />n. Materials testing during construction. <br />o. Construction inspection. <br />p. Construction staking. <br />q. Right-of-Way/Easement research and/or surveying. <br />r. Filing fees associated with permits, submittal fees, impact fees, etc. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.