Laserfiche WebLink
demolishing the neighboring building. They have offered a release of liability to the City, engineer <br />and our contractor should demolition of the Belford Building unintentionally spill over and impact <br />their building. Stephanie Harris, City Attorney, and the SMA Attorney are working these details <br />out, to be brought back to you at a later time. <br />STATUS OF ISSUE: <br />Hart Engineering, PLLC, has completed the design, traffic control plan (with TxDOT approval), <br />and bid/contractual specifications and documents; we are ready to proceed with bidding this <br />project in pursuit of a qualified demolition contractor. The RFB will be issued with a due date <br />TBD. With the assistance of Hart Engineering, in addition to the minimally required <br />advertisements in the Paris News, we will advertise on online platforms where appropriate as well <br />as direct contact with known qualified entities. Jason Hart is available tonight to answer questions <br />regarding the specification documents. Todd Mittge, City Engineer, will serve as staff liaison. <br />Following demolition of this building, it is our intent to take appropriate measures to take <br />ownership of the property given significant public dollars were spent in abating this nuisance. <br />BUDGET: <br />Working with Hart Engineering, they have developed an estimated cost for this project based on <br />design and known pricing in the market. So as not to influence bids, we have not listed that estimate <br />in our council packet, however that information is available to the City Council upon request. The <br />project is estimated to be within budget and should it exceed, we have available ARPA funds <br />should the City Council still wish to pursue the project under that scenario. <br />OPTIONS: <br />1. Authorize City Staff to proceed with bidding the Belford Building Demolition Project. <br />Award of a bid and contract will be brought back to the City Council for your consideration. <br />2. Request additional information, postpone the project, request changes to the specifications <br />and/or scope of the project, and/or cancel the project. <br />RECOMMENDATION: <br />1. Authorize City Staff to proceed with bidding the Belford Building Demolition Project. <br />Award of a bid and contract will be brought back to the City Council for your consideration. <br />