Laserfiche WebLink
The following Table is a listing of all of the significant capital outlay and improvement requests that have been added <br />to the Proposed FY23/24 Budget. <br />Department <br />Line Item I <br />Description <br />Expense <br />Notes <br />Accounting and Auditing <br />Payroll Lines <br />Assistant Finance Director <br />$ 98,000.00 ISee <br />Budget Message. Salary and Benefits. <br />Accounting and Auditing <br />01-0408-21-00 <br />Flag Pole & Flags <br />$ 7,400 00 <br />City Hall Flag pole and flags. <br />Airport <br />040915-61m98 IAWOSUpgrade <br />$ 125,000.00 <br />i <br />TxDOT90/lOgrant project t o replace aging AWOS system. <br />Airport <br />04-0217-61-00 <br />Furniture Replacement <br />$ 5,000.00 <br />Replace aging furniture in terminal. <br />Billing and Collecting <br />Payroll Lines <br />Meter Reader ... <br />$ 42,000.00 <br />See Budget Message Salary and Benefits. <br />_,w„ ....- , m.,, s .. <br />Pnilling and Collecting <br />10-1002-81-99 <br />Meter Reading Truck <br />$ 40,000.00 <br />Truck for new Meter Reader. <br />City Council <br />01-0350-11-00 <br />Housing Assessment <br />$ 65,000 00 <br />Phase II of Housing Assessment Study.mm <br />C�qtCouncil <br />04-0310-11-00 <br />Belford Demolition <br />$1 000 000 00 <br />Demolition of Belford Buildm� Public Safest <br />Phase II - Cleanup and Asbestos Abatement. City -owned <br />tyCi <br />4-0401-11-00 <br />Grand Theater <br />$ 100,000.00 <br />building..�.._.... <br />'City Manager <br />Payroll Lines <br />m _... <br />Officer Publie Information Offic <br />� <br />$ 76 000.00 <br />_ <br />....w.w��-._..._...�- � .�.. <br />See Budget Message. Salary and Benefits. <br />g g S <br />See Budget Message. Salary and Benefits. Spread out <br />City Manager <br />Payroll Lines <br />Assistant Ci Manager <br />City g <br />160,000.00 <br />0, <br />across Depts. 12, 82, and 86. Unbu _ <br />p-.�....8 dget Dir. of Utilities. <br />Code Enforcement <br />....__ + <br />01-1002-40-02 <br />Mower <br />$ 12,600.00 <br />mm <br />Nuisance abatement, replace aging mower. <br />Code Enforcement <br />04 1004-40-02 <br />1 2 Ton Truck <br />/ <br />$ 40,000.00 <br />Replace aging vehicle for code enforcement d <br />officer. <br />Replace aging equipment for better nuisance abatement <br />Code Enforcement <br />4 1004 40 02 <br />UTV _ <br />—.... <br />$ 16,000 00 <br />access. __ <br />Community Development <br />Payroll Lines <br />9 ..n <br />Secretary <br />�........._.. ............ ....... <br />$ 39,000.00 <br />m ......................... <br />See Budget Message. Salary and Benefits. <br />.... <br />See Budget Message. Salary. and Benefits. Note: This <br />EMS ........ ........... <br />Payroll Lines <br />'Crewmembers (x3) _,.,.. <br />$ 195,000.00 <br />6. <br />expense does not reflect net difference from PT. <br />_..--.... . <br />Per existing contract, Medicare regulations require survey <br />EMS <br />01-0318-54-00 <br />PCG Contract- Medicare Survey <br />$ 35,000.00 <br />completion. <br />EMS <br />05-0209-54-00 <br />IV Pumps <br />$ 20,000.00 <br />Better IV management and timing. <br />Reorganize existing personnel bags for greater ease and <br />EMS <br />_....._ <br />05-0211-54-00 <br />Jump Kits <br />$ 10,000.00 <br />.. ........ <br />less strain. <br />Medical equipment, four trucks have been outfitted, need <br />EMS <br />05-0211-54-00 <br />ents „�n <br />48,80100 <br />finishn al three <br />EMS <br />u....... .......................� <br />05-0401-54-00 <br />Eal r <br />Eastside Flooring <br />g <br />$ <br />of flooring _ _._ ...... .... <br />Countour mapping of city, 8 shots per meter. Will help <br />Engineering <br />01-0321-41-00 <br />Lidar Survey <br />$ 34,000.00 <br />�.... <br />with drainage, floodplain, developer, surveys, etc. <br />.. ..... ...... ...w - <br />Structural Analysis - Depot <br />Aging building, cracking occuring, need to determine if <br />Engineering mm ----01-1005-32-99 <br />04-0318-41-00 <br />Building <br />$ 38,000.00 <br />-._..__ <br />structural issues exist. City -owned building. <br />_. -. ....... - <br />Fire _ <br />Fire Marshall Truck ........... <br />$ 90,000.00 <br />_- <br />�..,..- <br />',Replace aging Fire Marshal Truck. <br />Fire <br />32- <br />01 0221_... 00 <br />Radios <br />$ 23,000.00 <br />�- <br />Radio replacement. <br />.....- — --. <br />—_,., <br />- ..............urch.m�- -_ <br />Funding set aside for future purchase of $2.2 million ladder <br />Fire <br />N/A <br />Ladder Apparatus Replacement <br />$1,SOD,000.00 <br />apparatus. 2+ year lead time for delivery. <br />Lift Station <br />01-0210-89-01 Microsoft 365 <br />05-0510-89-01 ',Switch and Server Replacem <br />01-0402-64-00 'Roof Repairs <br />01-0216-64-00 Furniture Replacement <br />05-0510-87-00 Lift Station IT Infrastructure <br />_—...Annualexpen....,., .............. <br />se. Current software support ends October <br />$ 55,000.002023. Shifting from server based to cloud based. <br />__.....-- - ....... ........................... .-..... <br />Switches __.. <br />connect offices to network, 12+ years old and <br />$ 43,000.00 failing. Servers also aged and failing. <br />_TiZc7roof repairs. <br />$ 45,000 00�C��eplac:e <br />ina in furniturethroughout building. <br />w�ed to$ 16,000.00 <br />maintain offsite connection to liftstation. <br />Page 20 of 23 <br />