Laserfiche WebLink
Item No. 19 <br />Memorandum <br />TO: Mayor <br />Mayor Pro Tem <br />City Council <br />FROM: Todd Mittge, City Engineer <br />SUBJECT: Drainage Analysis Presentation — Upper Tributaries 4 and 6, Big Sandy Creek <br />DATE: August 14, 2023 <br />BACKGROUND: The City of Paris has drainage challenges throughout the city. This analysis <br />combines 5 months of first-hand observations by the City Engineer and other staff from the Winter <br />of 2023, along with historical data from the last major flood events since 2016 and anecdotal data <br />going back to the 1970's for Tributaries 4 and 6 of Big Sandy Creek. This analysis and its <br />associated recommendations complement the Cobb-Fendley Engineering report from 2016. Please <br />contact the City Engineering Department for a copy of that report. <br />Tributaries 4 and 6 drain parts of the Northeast and Southeast Quadrants of the City of Paris, Texas. <br />Drainage pathways include rooftops, surface drains on city streets, some enclosed drainage <br />systems, grass/dirt lined open channels, concrete lined V-shaped channels, concrete lined <br />trapezoidal channels, and concrete lined rectangular channels. All of the channelized pathways <br />vary in capacity, and may be inconsistent with the amount of flows required of them. A visual <br />illustration of these are shown below. <br />Upon my initial review of the situation, I recommend that the city: <br />1) Further Explore expanding the sizes of some channels in strategic locations. <br />2) Clean out the channels of significant obstacles and debris. <br />3) Build detention ponds in key locations. <br />4) Utilize city staff to perform this work as soon as possible, contracting out where needed. <br />5) Continue proper enforcement of drainage detention through our subdivision ordinances. <br />Improve ordinance language where necessary. <br />6) Conduct Lidar laser survey citywide to capture existing topography and aid in future <br />studies. <br />There are some city properties adjacent to the tributaries where flood overflow detention facilities <br />could be built which will help alleviate flooding downstream. There is also the opportunity to <br />partner with a private property owner to build a larger detention facility near Lamar Avenue. <br />