My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 - Pickleball Status Presentation
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
10 - OCTOBER
>
October 9
>
10 - Pickleball Status Presentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 11:57:06 AM
Creation date
10/5/2023 11:55:26 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Court color to beplaying area with border. Materials will be <br />Plexi Pave or equivalent. Please anticipate the work to fake 3 to 4 days, weather permitting. <br />Please allow a minimum of 24 hours for surface coatings to cure. <br />Price to resurface (1) court: $ 10,396.00 (tax exempt entity) Initials , <br />PICKLEBALL NETS AND POSTS: <br />Pickleball Premier XS posts — 2 7/8" (Grn or (9 <br />pair` <br />Price: $ 660.00 X 4 = $ 2,640.00 Initial `gf' <br />Installation: $ 3,400.00 Initial m <br />Pickleball Net: <br />Provide and install 1 Douglas Pickleball net. Vinyl coated polyester headband with 3.Omm <br />netting. Carries a 4 -year warranty. 36" high net or shorter 31" high (allows players to kick the <br />ball to other side vs. bending down to pick u,r <br />P, rice re ulnar hei bt $170.00 x 4 = $680.00 v Initial. <br />Price shorter height: $ 170.00 x 4= $ 680.00 m Initial <br />,N,°.� <br />TOTAL PRICE: $—--� n ! / Imti21 N <br />NOTE: These courts are in terrible condition. We would typically not resurface the courts due <br />to their deterioration. This proposal is to do the best we can with what we have to work with. <br />The courts will look nice, but they will not be up to the standards we typically prefer. Our <br />recommendation is to rebuild the courts. <br />TERMS: 100% upon completion <br />PRICE QUOTES ARE GUARANTEED FOR 30 DAYS <br />DISCLAIMER: The new surface will not significantly improve the drainage of an existing court. There is no <br />guarantee that there will be no standing water on the court after the new surface is complete. <br />NOTE: Cracks can start coming back through the surface immediately. <br />RESPECTFULLY SUBMITTED, m <br />DOBBS TENNIS COURTS, <br />INC. ERIC6 <br />By: Rich Wood (817) 307-6114 641-21 <br />20-0201 <br />c <br />Accepted By Date <br />Print Name �� - %� Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.