My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 - Nabors Demolition contract for Belford Building Demolition Project - addition of bid alternate #1
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
12 - DECEMBER
>
December 11
>
26 - Nabors Demolition contract for Belford Building Demolition Project - addition of bid alternate #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 11:29:54 AM
Creation date
12/7/2023 11:17:45 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONFIRM THAT COMPANY'S BID INCLUDES ALL SCOPE ITEMSINECESSARY <br />TO COMPLETE THE DEMOLITION PROJECT, INCLUDING BUT NOT LIMITED <br />TO THE FOLLOWING: <br />Obtain bid bond <br />Install temporary bracing at north side of 230 Sou�mmih <br />Main Street (vacant loci <br />Obtain payment bond <br />Demolish chimney <br />.... . . ..... .. . .. ..... . .... . ......... . . ..... . .... <br />Obtain performance bond. <br />Demolish Belford Building down to basement & <br />...... _,__, . . . . . ....... . ........ <br />230 S. Main St. down to crawl space, leaving north <br />Obtain maintenance bond <br />wall. at 230 S. Main St. up to 8 feet above sidewalk <br />. . . ....... <br />Prepare site-specific health & safety plan <br />Haul demolished materials to landfill <br />............. . <br />.... . . . ............... ..... ... . .............. .. .. ........... . <br />Install temporary fence <br />Selective basement demolition <br />Photograph survey of adjacent <br />buildinjs/street <br />Dust control measures when necessary <br />Disconnect utilities <br />Daily cleanup <br />Drain basement pool <br />Inspect road signs and barricades throughout <br />;,ro'�ect <br />Notify, TDHS about demolition <br />Foundation demolition 2' below slab <br />Install barricades and traffic signs <br />Install erosion control silt fences <br />Remove asbestos -containing materials <br />. .. . . ....... .. <br />Import fill <br />.. . ...... . . <br />Dispose of asbestos -containing materials <br />Compact fill in lifts <br />Salvage owner -requested materials (Add <br />Alternates) <br />Grade site <br />Remove elevator machinery & <br />Install 8" topsoil. <br />counterweights <br />Remove trees <br />Install chain link fence <br />. .. . ....... <br />Install stabilized construction entrance <br />Photograph survey of adjacent buildings/street <br />PAGE 3 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.