Laserfiche WebLink
APPENDIX A: <br />TABLES <br />Sample General <br />Sample Location Material Friability Percent (%) Response Action <br />Quantities (SF / LF) <br /># Condition <br />01 <br />SW Corner Main Roof/Fly Loft <br />Non-Abatement in Accordance <br />North Center Fly Loft 4,160 SF <br />02 Roofing Membrane Fair 15% Chrysotile <br />with EPA and TAHPR <br />friable <br />NE Corner Main Roof/Fly Loft <br />03 <br />04 <br />North Wall <br />Roof Flashing on Non-Fair / <br />Abatement in Accordance <br />West Wall 792 SF <br />05 18% Chrysotile <br />with EPA and TAHPR <br />Parapet Wall friable Damaged <br />East Wall <br />06 <br />07 <br />SW Corner Fly Loft <br />Parapet Wall Cap Non- <br />Abatement in Accordance <br />NW Corner Fly Loft 264 SF <br />08 Fair 2-3% Chrysotile <br />with EPA and TAHPR <br />(Tile/Grout) friable <br />NE Corner Fly Loft <br />09 <br />st <br />16 <br />1 Floor Seating (Central) <br />12 x 12Ñ Vinyl Floor Non-Fair / <br />Abatement in Accordance <br />st <br />1 Floor Seating (Near Stage) 728 SF <br />17 3% Chrysotile <br />with EPA and TAHPR <br />Tile friable Damaged <br />st <br />1 Floor Seating (West) <br />18 <br />28 <br />Left Restroom <br />Non- <br />Abatement in Accordance <br />Right Restroom 240 SF <br />29 Ceramic Wall Tile Good/Fair 2% Chrysotile <br />with EPA and TAHPR <br />Friable <br />Left Restroom <br />30 <br />st <br />34 <br />1 Floor Seating S. Ceiling <br />Ceiling Plaster Fair / Abatement in Accordance <br />nd <br />2 Floor Landing 11,500 SF <br />35 Friable 2% Chrysotile <br />with EPA and TAHPR <br />System (Painted) Damaged <br />nd <br />2 Floor Balcony Ceiling <br />36 <br />49 <br />Abatement in Accordance <br />Basement / Mechanical / Equipment 4-6 Flanges <br />50 Flange Gasket Friable Good/Fair 40% Chrysotile <br />with EPA and TAHPR <br />51 <br />64 Thermal System <br />Basement Piping at Mechanical Unit <br />Abatement in Accordance <br />Basement Central Pipe 63LF <br />65 Insulation with Friable Good/Fair 55% Chrysotile <br />with EPA and TAHPR <br />Basement Piping at Exit through wall <br />66 Mastic <br />73 <br />Left Restroom (WomenÓs) <br />Aggregate Wall <br />Abatement in Accordance <br />Right Restroom (WomenÓs 240 SF <br />74 Friable Good/Fair 2% Chrysotile <br />with EPA and TAHPR <br />Covering <br />Left Restroom (WomenÓs) <br />75 <br />76 <br />Plaster Ceiling with <br />Abatement in Accordance Included in the <br />nd <br />2 Floor Balcony Projector Room <br />77 Friable Good/Fair 2% Chrysotile <br />with EPA and TAHPR estimate for 34,35,36 <br />Rough Texture <br />78 <br /> <br />