My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
28 - Street Mill & Overlay 2024 Projects
City-of-Paris
>
City Council
>
Agenda Packets
>
2023
>
12 - DECEMBER
>
December 11
>
28 - Street Mill & Overlay 2024 Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 11:30:15 AM
Creation date
12/7/2023 11:22:02 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
arterial roadways, let alone residential. Our goal is to mill and overlay those roads that help address <br />the biggest needs in our community (the heaviest traffic). We have identified the following <br />roadways with cost estimates: <br />A map showing each of these roads is included in your packets. You can also find some sample <br />images of each roadway included in your packet. As was stated, there is no end to the amount of <br />roadway surface in Paris that we could address. Staff have attempted to identify and prioritize <br />arterial -type roadways, those portions of them in most need, while spreading the funding out across <br />town. The intent is for each to receive a standard 2" mill and overlay, however some may require <br />additional work. <br />Project Length <br />(Miles) <br />Project Total <br />Graham Street <br />.. ........ <br />(19thNWto Railroad Tracks) <br />$. <br />183,223.60 <br />North Collegiate Drive <br />. ............. ..... _. <br />(Lamar Ave to NE Loo .286) <br />0.931 <br />$ <br />582,497.06 <br />Fitzhugh Street <br />_. (Pine Bluff Rd to Hickory St) <br />0.754 <br />$ <br />365,753.86 <br />_ <br />24th Street SE <br />(Lamar Ave. to Clarksville St.) <br />......... <br />0.512 <br />$ <br />165 381.03 <br />, ........_.... _. <br />_ <br />'Pine Mill Road (Inside Loop) <br />........ <br />(30th St NE to NE Loop 286) <br />0.605 <br />$ <br />328,853.52 <br />7th Street SW (501s0Split w/Cefco) <br />(South of SW Loop 286) 510 LF <br />0.1 <br />$115,000: <br />(50/50 Split with CEFCO)i <br />Pine Mill Road (East of Loop) <br />(TxDOT RW to 42nd NE) <br />0.360 <br />$ <br />163,737.16 <br />20th Street SE <br />(Clarksville St to Polk St) <br />0.187 <br />$ <br />61 011.42 <br />12th Street SE <br />(Austin St to Trail de Paris) <br />....... <br />0.635 <br />$ <br />236,949.69 <br />West Sherman Street <br />_.a <br />(15th SW to 19th SW) <br />0.258 <br />$ <br />89,077.79 <br />13th Street NW <br />_ . _.. <br />(Campbel I St to Bonham Rd) <br />0.609 <br />$ <br />194,844.25 <br />Martin Luther King, Jr. Drive <br />_ <br />(Fitzhugh to 6th St NE) <br />0.223 _ <br />$ <br />111,424.43 <br />West Campbell Street <br />(13th St NW to 19th St NW) <br />0.397 <br />$ <br />131,936.06 <br />West Center Street <br />(19th St NW to North Main St) <br />1.239 <br />$ <br />477,304.75 <br />Misc. Curb and Gutter, Valley Gutter Replacement 2.000 LF) <br />$ <br />90,000.00 <br />Total Miles <br />7.322 <br />$ <br />3,296,995 <br />A map showing each of these roads is included in your packets. You can also find some sample <br />images of each roadway included in your packet. As was stated, there is no end to the amount of <br />roadway surface in Paris that we could address. Staff have attempted to identify and prioritize <br />arterial -type roadways, those portions of them in most need, while spreading the funding out across <br />town. The intent is for each to receive a standard 2" mill and overlay, however some may require <br />additional work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.