My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet
City-of-Paris
>
City Council
>
Agenda Packets
>
2024
>
01 - JANUARY
>
01-08-2024
>
Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 2:05:04 PM
Creation date
1/4/2024 2:01:49 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular Council Meeting <br />December 11, 2023 <br />Page 8 <br />Project Length <br />(Miles) <br />Project Total <br />Graham Street (19th NW to Railroad Tracks) 0.512 <br />$ 183 223.60 <br />North Collegiate Drive (Lamar Ave. to NE Loop 286) 0.931 <br />$ 582,497.06 <br />?Fitzhugh Street (Pine Bluff Rd to Hickory St) 0.754 <br />$ 365,753.86 <br />24th Street SE Lamar Ave. to Clarksville St. 0.512 <br />$ 165,381.03 <br />Pine Mill Road (Inside Loop) (30th St NE to NE Loop 286)__ 0.605 <br />$ 328,853.52 I <br />7th Street SW (50/50 Split w/ Ceko) (South of SW Loop 28 6) 510 LF 0.1 <br />$115,0001. <br />(50150 Split with CEFCO) <br />Pine Mill Road (East of Loop) (TxDOT RW to 42nd NE) 0.360 <br />$ 163,737.16 <br />20th Street SE (Clarksville St to Polk St) 0.187 <br />$ 61 011.42 <br />12th Street SE (Austin St to Trail de Paris) 0.635 <br />$ 236 949.69 <br />West Sherman Street (15th SW to 19th SW) 0.258 <br />$ 89,077.79 <br />13th Street NW (Campbell St to Bonham Rd) 0.609 <br />$ 194,844.25 <br />Martin Luther King,_ Jr. Drive (Fitzhugh to 6th St NE) 0.223 <br />$ 111,424.43 <br />West Campbell Street (13th St NW to 19th St NM 0.397 <br />c <br />$ 131,936.06 <br />r-- <br />West Center Street (19th St NW to North Main St) 1.239 <br />$ 477,304.75 <br />Misc. Curb and Gutter, Valley Gutter Replacement (� 2000 LF) <br />�- - - <br />$ 90,000.00 <br />I <br />Total Miles"; 7.322 <br />$ 392969995 <br />Mr. Path also said at the October 23, 2023 City Council meeting, the City Council <br />authorized an agreement with Garver Engineering to perform a lead-based piping <br />inventory <br />pursuant to Federal Law. He said this project would ultimately result in the replacement of all <br />lead-based lines in town and staff had worked with Garver to prioritize the above listed roads so <br />that should any of the roads be found to have service lines that needed to be replaced that they <br />would try to replace those pipes prior to mill and overlay of the road. <br />Council Member Kessel inquired about the timeline to identify lead pipelines. <br />Assistant <br />City Manager Doug Harris said they should be able to identify the lead pipes easily because of <br />the prioritization of the roads. <br />A Motion to approve the designated roads for the Street Mill and Overlay Projects was <br />made by Council Member Kessel and seconded by Council Member Norment. Motion carried, 4 <br />ayes — 0 nays. <br />
The URL can be used to link to this page
Your browser does not support the video tag.