My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16 - Amendment No 3 to Professional Services Agreement with Computer Information Systems - Digi-Ticket E-Citation System
City-of-Paris
>
City Council
>
Agenda Packets
>
2024
>
01 - JANUARY
>
01-22-2024
>
16 - Amendment No 3 to Professional Services Agreement with Computer Information Systems - Digi-Ticket E-Citation System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 2:32:42 PM
Creation date
1/18/2024 2:30:35 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PASS POLICE DEPARTMENT TEXAS <br />LICI�NSE AGREEMENT #345 <br />08-22-2007 <br />Other Special Program Products may also be delayed such as Interfaces <br />because_ they depend on third party product delivery and availability of their <br />specifications, equipment and test facilities for use by CIS. <br />5.3 TASK 3 -OTHER PROGRAM PRODUCTS, SPECIFICATION, PROCUREMENT <br />AND DELIVERY AS APPLICABLE - None <br />5.4 TASK 4 -BASIC PROGRAM PRODUCTS GENERATION <br />Generatipn by CIS commences after completion of Task 1 and Task 2 and takes <br />twelve (12) weeks. <br />5.5 TASK 5 -MANAGEMENT TRAINING, ORIENTATION AND SYSTEM <br />ACCEPTANCE <br />Management training and orientation commences after System generation in <br />Task 3 or after the hardware systems (Network Technology, User Network <br />Connectivity and Users' Local CANS, Workstations and Printers) are installed and <br />WHY operational, whichever is later. For planning purposes, two (2) weeks will be <br />allotted for this task although the User may have a scheduling problem. <br />5.5 TASK 5 -INSTALLATION AT USER SITE, SYSTEM ACCEPTANCE AND <br />AGENCY PREPARATION <br />System installation and Acceptance Verification at the User site will be one (1) <br />week after Task 5. <br />5.7 TASK 7 -PERSONNEL, TRAINING <br />Personnel training will commence when User can schedule its personnel for <br />training within a one (1) week period. The actual start of training will begin after <br />the User completes specific tasks such as completion of the geofile and <br />tables including each employee's security profile (for which CIS will traDade <br />in the <br />User). <br />5-$ TASK S -ONE (1) C'S SYSTEMS YEAR WARRANTY, MAINTENANCE AND <br />SUPPORT <br />The one (1) year warranty, maintenance and support period commences capon <br />the pate of Acceptance Verification of the Basic Program Products. <br />25 <br />7TE)P 7t)WA rl—IWT ?t [CLJ1slf11 +7 PP r' Cq)t7PT C-7 :C7 1G11A.7177JOYa <br />
The URL can be used to link to this page
Your browser does not support the video tag.