Laserfiche WebLink
CHANGE ORDER <br />No. 2 <br />Prosect .Belford.. Building Demolition _ Date of Issuance: ,February„12 2024 <br />Contract For: Demolition of 4 story Belford Building of 260 S Main Street and adiacent 1-stos building, <br />...... ,.� ...__..... <br />OWNER: City of ParisContract Date. November 13 2023 <br />S „ Texas 75460 <br />Address: _135 Southeast 1 , treet Paris <br />CONTRACTOR: µLloyd D „Nabors Demolition LLC <br />Engmeer,_Jaso.0 Hart Engineering PLLC �. Engineer's Project No. ,2251 <br />You are directed to make the following changes in the Contract Documents. Each Change Order shall be specific and final as <br />to prices with no reservation or other provisions allowing for future additional money or time as a result of the particular changes <br />identified and fully compensated in the Change Order. <br />Description: Credit for not rebuild nq the north wall of 1 stogy. building, Additional effort to save north wall of 1 -story building Credit for 478 cubic <br />Wards of dirt not trlaced alongLbottom of north„wall µof 1, -story building, Labor_ap_ e�u��ment to cut alonr�tor� of north wall of 1-gorybuddinct Credit <br />_ ment wallmand,floor slab,.@1ona-east basement wall Credit for leavingthe sidewalk alanmg the_east aroTaPrtd line.,_,., <br />for not saw-cuttin east base, <br />Purpose of Change Order: Adyust,Pro�ect cost based.on items listed in the Description above, „ , , , , <br />Attachments: <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: l <br />Original Contract Price Original Contract Time: <br />$ _588,000.00.... .. . . ...... ........................... .. .............. N/A <br />(Dais or DatoRan ep <br />..o... <br />�.m <br />Net price change from previous Chamnge Order(s) Net change from previous Change Orders: <br />Extras to date $ 13 500,00 <br />.. <br />. -.... m� .... _. <br />Credits to date $ .e. 0 . ....- ...__. --�. (Days) <br />Net $ 0 <br />_ —n ........ ....... ......... ......... -- ..._._._ ......... <br />Contract Price prior to this Change Order: Contract Time prior to this Change Order: <br />$..601.5.Q9.�.00.. _........�__.....__..._ N/A <br />.... <br />(Days or Date Rahel ®1055 <br />Net Increase (Decrease) of this Change Order: Net Increase (Decrease) of this Change Order: <br />$..(86,850.0.0) .. 0 <br />r,Da s ------ -- <br />— ---- <br />Contra-ct- <br />Price with all approved Chang—e Orders: 'Contract Time with all approved Change Orders: <br />$ 514,650.00,N/A <br />Cumulative Contract Increase (Decrease),,,, .......% (Days or Date Range) <br />._. . .... .... .. ...,,,_ �...... <br />Original Funds Available For Change Orders--:- <br />Remaining Funds Available For Change Orders: <br />$.....N/A-__-__-----_.- ,. <br />Additional Funding, If Necessary: pees p <br />$ N/A <br />Signature of the CONTRACTOR indicates that he/she has read this Change Order from and any referenced attachments and <br />that he/she is in agreement herewith, including any adjustment in the Contract Price or Contract Time. <br />Recommended: Approved: Approved: <br />(Engineer) (OWNER) (CONTRACTOR) <br />Date: February 7 2024 Date:Date: <br />June 21, 2023 ITEM A-7 CHANGE ORDER Belford Building Demolition <br />