My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24 - Development Fee Schedule Update
City-of-Paris
>
City Council
>
Agenda Packets
>
2024
>
04 - APRIL
>
04-22-2024
>
24 - Development Fee Schedule Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2024 11:54:02 AM
Creation date
4/18/2024 11:53:46 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(v). 16-20 Lots: _$1000.00 ger .plat plus fifteen dollars ,1515,00_leer lots <br />(vi). 21-50 Lots: 1500.00 ger plat :plus fifteen dollars 15.00e�r lo_t. <br />(vii). 51- Over Lots: 2000.00 ger lat . lus twent dollars x'20.00 aer lot. <br />(E) Minor Plats. Three hundred dollars ($300.00) per minor Mat. <br />In addition to these fees, an additional thiriv nine dollar check or current filing, fee) shall be submitted with <br />all final plats, Lejslats and minor plats for County filing expense. The check shall be made to the Lamar Count <br />Clerk for filing, fees. <br />(c) Public work fees — water and sewer taps. <br />(1) Water. <br />(A) Standard 1" -in pavement: $1,790.00. <br />(B) Standard I" - in soil (same side): $890.00. <br />(C) Standard 2" - in pavement: $2,610.00. <br />(D) Standard 2" - soil (same side): $1,900.00. <br />(E) Split service - in pavement: $2,610.00. <br />(F) Split service - soil (same side): $1,100.00. <br />(G) 5 & 5 program: See policy. <br />(H) Dc posit for Construction Water Meter, '2500,OQ Ed,�� <br />r,i p e S d <br />(1) Construction Water Meter rate: See A10.003 for Commercial Water Rates <br />vvifl] <br />(2) Sewer. <br />(A) Standard 4" - in pavement: $2,260.00. <br />(B) Standard 4" - in soil (same side): $800.00. <br />(C) Standard 6" - in pavement: $2,500.00. <br />(D) Standard 6" - soil (same side): $1,000.00. <br />(E) Split Service - in pavement: $2,210.00. <br />(F) Split service - soil (same side): $1,000.00. <br />(G) 5 & 5 program: See policy. <br />(d) Fire department and fire marshal fees. <br />(1) Fire construction permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.