Laserfiche WebLink
(4) Signs. <br />(A) <50 sq. ft. (single sided or re -face): $50.00. <br />(B) <50 sq. ft. (double sided): $75.00. <br />(C) >50 sq. ft. (single sided or re -face): $100.00. <br />(D) >50 sq. ft. (double sided): $150.00. <br />(E) Monument sign: $200.00. <br />(F) Flags & banners (temp signs): $75.00. <br />(G) Billboards: $500.00. <br />(H) Billboard annual registration: $100.00. <br />(1) Sign recovery: $25.00. <br />(5) Miscellaneous building department permits. <br />(A) Solar system: $50.00. <br />(B) Moving (building): $100.00 per building. <br />(C) Construction trailer: $100.00. <br />(D) Demolition: $50.00. <br />(E) Temp pole electric: $50.00. <br />(b) Engineering departmentfees. (Edi . rr° I ,�ote: E,.ginu i�°2ruggdii�P artme:w ai:lJushw , If w Ii enis If:�., �,.� a d 7 <br />are based on state paw cbanges % lffle Item f8 is b sd,xi on unrerrn rrp n"AluCrrA/ prr011 <br />urr'll:krrad iii:)n.) <br />(1) Site plan review: $120.00 an hour. Site pefmit and engineering ob w it ,,ubl ents <br />0 <br />(2) Site ermit; $1µ00µ,0w0. Site pefmit and engineering fee job with no publie improvements. $100.00. <br />(3) Engineering Inspections: $120.00 an hour. it: $250.00, <br />(4) Grading permit: $250.00. r'e., frog pefm t (tree ,.o,,.,,,yal). $200.00. <br />(5) Clearing hermit (tree removal): $200.00. Right -of Way (ROW) wer-ki g i right e f way-$ nn nn <br />(6m Rigg t -of way -(ROTI - working m right-of-way: $100.00. <br />U7 Third Party consultation, review or inspectipns;w_Actua Cost. (E, itc�r PQo e: PLI's I:puIxflnjl) d pe�nsii�� for <br />(8) Platting. (Duikii�r' Nimrod ftin ::p urr7rrrrrrrr.:o rig ani(cxp"rrarrrr err: �n mm:;uue &w�.�afl") <br />Prelimina:�Pl_at...Will be a gradual increasing scale as follows: <br />