My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-016 - Amend Appendix A Fee Schedule Section A3.002 Development & General Construction and Planning Permit Fees
City-of-Paris
>
City Clerk
>
Ordinances
>
2024
>
2024-016 - Amend Appendix A Fee Schedule Section A3.002 Development & General Construction and Planning Permit Fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 9:11:42 AM
Creation date
4/23/2024 3:04:48 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(v). 16-20 .. $1000.00 per plat plus fifteen, dollars ,$15.00) leer lot. <br />(vi). 21-50 Lots:IT mmmm $1500.00 per plat plus fifteen dollars 1. 00.)J er lot. <br />(vii). 51- Over Lots:,__. ww$2000.00 icer flat plus twenty dollars i`$20 0-01p.q lot. <br />iE) Minor Plats. Three hundreddollars300,00) per minor plat. <br />In addition to these fees an wadditional thirty nine dollar check LQT.gpgqq.ffljRg fee) shall be submitted with <br />all final flats, replats and minor plats.for County.filinggexpense. The check shall be made to theLamarCounlw <br />Clerk forfiling fees, <br />(c) Public work fees — water and sewer taps. <br />(1) Water. <br />(A) Standard 1" -in pavement: $1,790.00. <br />(B) Standard 1" - in soil (same side): $890.00. <br />(C) Standard 2" - in pavement: $2,610.00. <br />(D) Standard 2" - soil (same side): $1,900.00. <br />(E) Split service - in pavement: $2,610.00. <br />(F) Split service - soil (same side): $1,100.00. <br />(G) 5 & 5 program: See policy. <br />(H), Deposit for Construction Water Meter: '$2500.00 �s��"ai��il�°��� Ni�wc : Ilncr ase, d pcµsa t1i) actua� cost of' <br />t 1 Construction Water Meter rate: See A10.003 for Commercial Water Rates 11�''Ia i V y hig n q -a t <br />(2) Sewer. <br />(A) Standard 4" - in pavement: $2,260.00. <br />(B) Standard 4" - in soil (same side): $800.00. <br />(C) Standard 6" - in pavement: $2,500.00. <br />(D) Standard 6" - soil (same side): $1,000.00. <br />(E) Split Service -in pavement: $2,210.00. <br />(F) Split service - soil (same side): $1,000.00. <br />(G) 5 & 5 program: See policy. <br />(d) Fire department and fire marshal fees. <br />(1) Fire construction permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.