My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20 & 21- Pickleball Construction at Sports Complex
City-of-Paris
>
City Council
>
Agenda Packets
>
2024
>
05 - MAY
>
05-13-2024
>
20 & 21- Pickleball Construction at Sports Complex
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2024 2:38:49 PM
Creation date
5/9/2024 2:38:34 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS <br />- PRO TECH TRACK & TENNIS, INC to provide general liability, automotive and workman's compensation insurance <br />coverage as required. <br />- PRO TECH TRACK & TENNIS, INC will provide project final clean-up of work area relating to scope of work. <br />- OWNER will be responsible for providing the necessary water to complete the entire scope of work. <br />- If color or design selection or accessory choices change after approved selection, additional costs will be incurred and the <br />Owner shall grant PRO TECH TRACK & TENNIS, INC. extension of time for the delay. <br />- Owner will be responsible for costs of any/all vandalism that could occur over the duration on the project directly related to <br />the scope of work. <br />WARRANTY <br />PRO TECH TRACK & TENNIS, INC. warrants and guarantees that it shall perform all work in a good and workmanlike manner, <br />in conformity with design and industry standards. Neglect of product and/or vandalism is not under warranty. An act of <br />God is not covered under warranty. PRO TECH TRACK & TENNIS, INC. provides a TWO -year warranty on construction and <br />surfacing. The warranty is from the date of substantial completion. <br />DISCLAIMER <br />New surface will not resist the effects of strong detergents, cleaners, oil, or any other types of solvents besides water. New <br />surface will not resist cleats or other sharp objects that may scratch the surface. Use of bikes, skates and other recreation <br />scooters or vehicles will not be allowed on the new surface. New surface warranty does not cover cracks; cracks are pre- <br />existing problems that may reappear because of weather or an act of God. <br />Even when color coatings are applied with care by a skilled operator, some squeegee marks and other slight variations in <br />color and texture are inevitable. This is because of the formulation of acrylic causes components to migrate to the edge of <br />the material as it is being applied. As a result, on observer will be able to spot where the material was poured on the <br />surface, where the squeegee operator turned to make a pass in the opposite direction or where one pass overlapped <br />another. Squeegee marks will be more visible on lighter colors and more common when coatings are applied in hot weather <br />or when they include coarser sand. Humidity, angle of the sun when the acrylic is applied and other factors all may affect <br />the frequency and visibility of these marks. <br />Due to the nature of the material and the human element in court construction, squeegee marks are likely to occur, like <br />marks in newly vacuumed plush carpet or newly mowed grass. They will not affect play and will become less visible as the <br />court wears and ages. <br />PLEASE INTIAL HERE <br />SCHEDULING <br />All project activity shall be scheduled and coordinated with PRO TECH TRACK & TENNIS, INC. No work will take place during <br />days when inclement weather is apparent. Necessary extensions in time may be required due to complications resulting <br />from weather and / or conditions out of control of PRO TECH TRACK & TENNIS, INC. <br />OWNER will need to ensure all other trades will not interfere with court construction. OWNER will be responsible for <br />vandalism during the construction process. <br />SCHEDULE OF VALUES <br />70% UPON COMPLETION OF POST -TENSION SLAB $ 3 8 3,4 8 7.9 7 <br />30% UPON SUBSTANTIAL COMPLETION OF SCOPE x16 4J 3 51.9 9 <br />TOTAL $ 547,839.96 <br />NOTE <br />Due to the payment terms listed above PRO TECH TRACK & TENNIS, INC. requires a 10 business day turn around once <br />completed scope is invoiced. <br />PAGE 13 <br />PO BOX 8024 TYLER, TEXAS 75711 <br />903-570-7343 903-894-6461 <br />
The URL can be used to link to this page
Your browser does not support the video tag.