My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-2024 Agenda Packet
City-of-Paris
>
City Council
>
Agenda Packets
>
2024
>
08 - AUGUST
>
08-26-2024
>
08-26-2024 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 4:59:08 PM
Creation date
8/23/2024 4:58:09 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF REGULAR MEETING <br />AIRPORT ADVISORY BOARD <br />107 EAST KAUFMAN STREET <br />PARIS. TEXAS <br />THURSDAY MAY 16,2024,5:30 P.M. <br />1. The Airport Advisory Board was called to order at 5:30 p.m. by Airport Manager Paul Strahan. <br />Members present: Scott Jackson and Jeffrey Nichols. <br />City Representatives: Councilman Gary Savage, Assistant City Manager Robert Vine, and Airport <br />Manager Paul Strahan <br />2. Citizen's Input. <br />No one spoke during the citizen's forum. <br />3. Approval of Minutes <br />The May 16, 2024, minutes needed approval, motion made to approve the minutes by Jeffrey <br />Nichols and seconded by Scott Jackson. <br />4. Receive Report from the Airport Manager. <br />• Entry Sign to the Terminal Update <br />Airport received the entry way signs for both the front and rear entrances of the terminal. This <br />project overall was around five months. The airport selected SCS Graphics located here in Paris <br />for the sign and installation. Since the terminal has never had an entry way sign, the airport was <br />able to use the RAMP Grant through TXDOT to get 90/% of the total invoice covered. <br />• Fly — In Report <br />Unfortunately the fly — in was cancelled due to weather. The airport has tried to have the fly — in <br />around April or May before the summer heat sets in but this has been unsuccessful due to weather. <br />Going forward the airport will see if a fly — in can be done in September / October time frame. <br />This option will help avoid rain and the summer heat. <br />• Runway Project Update <br />The progression of the runway project is going smoothly. TXDOT projected the project to start on <br />July 5t' but the airport is going to suggest the project start on July 80' in order to get the airport <br />through the July 0' weekend. The runway project will consist of the runway receiving new asphalt, <br />the main taxiway receiving a seal coat, the taxiway connectors and main apron will receive a crack <br />seal job. New paint will be the last item to complete the overall project. TXDOT received two bids <br />for the project, bids needed to be submitted to TXDOT by May 8`h, 2024. TXDOT held a Zoom <br />meeting in Austin, Tx to read the submitted bids. After reading both bids, Ambrozi Contracting <br />won the bid and will be completing all of the work for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.