Laserfiche WebLink
9. Millwork cabinets and countertops have been included for breakrooms in <br />production office and business office areas. <br />a. Production offices — Allowance of $32,000.00 <br />b. Business Office — Allowance $22,000.00 <br />10. Expansion/ control joint sealants for paving, foundations, and CMU walls. <br />11. Hollow metal frames, hollow metal & wood doors with hardware for production <br />building, business office/ locker room and shipping office. <br />12. Overhead steel rolling doors at production building. <br />a. 20'-0" x 16'-0" O.H. Coiling Doors — 22 ca <br />b. 26'-0" x 20'-0" O.H. Coiling Doors -- 5 ea <br />c. 12'-0" x 8'-0' O.H. Coiling Doors — 3 ea <br />d. 20'-0" x 60'-0" Manual Sliding Door -1 ea <br />13. Interior stud framing and drywall, ceilings, painting, floor finishes, miscellaneous <br />specialties for production office/ restrooms, business office/ locker room and <br />shipping office. <br />44. <br />eveler- and �ORI-01dim� <br />15. Appliance allowance for production and business office breakroom areas. <br />16. Pre -Engineered metal buildings: <br />a. Production Building - 290,640 PEMB with roof and wall insulation. <br />b. Business Office Building —14,400 SF PEMB with roof and wall <br />insulation. <br />17. Mobile/ Portable building for 1,000 SF shipping office. <br />18. Cranes at production building include: 3 -ton for maintenance, 55 -ton for coil <br />storage,'/2-ton jib at coil storage, 1 -ton at curing, 1 -ton at lining and 10 -ton at <br />lining. <br />19. Plumbing systems: <br />a. Production Building — Water, sewer and vent piping for office restroom <br />fixtures and production restrooms fixtures, floor drains, natural gas lines, <br />compressed air lines and steam lines. <br />b. Business Office — Water, sewer and vent for fixtures at restrooms, locker <br />room and breakroom. <br />c. Shipping Office — Water, sewer and vent for fixtures at restroom. <br />20. New fire sprinkler protection system at production coating area and poly storage <br />building only. <br />21. Mechanical systems: <br />a. Production Building - Heat and AC to production offices/ breakroom/ <br />restrooms, infrared tube heat and dehumidification at coating area, heat <br />and AC to coating mixing room with roof top exhaust and unit heaters at <br />Builders Since 1887 2510 South Church Street I Parks • Texas 75460 1 903.785.1653 1 1.800.442.TEAM Fax 903.784.1471 1 www.hwh1887.com <br />