My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet
City-of-Paris
>
City Council
>
Agendas
>
2025
>
06-09-2025
>
Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 6:58:03 PM
Creation date
6/5/2025 6:49:19 PM
Metadata
Fields
Template:
AGENDA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 21 <br />I <br />TO: Mayor, Mayor Pro Tem & City Council <br />FROM: Rose Beverly, City Manager <br />Todd Mittge, City Engineer <br />Stephanie Harris, City Attorney <br />SUBJECT: 7t" Street SW Reconstruction Project Award Recommendation <br />DATE: June 9, 2025 <br />BACKGROUND: <br />The City of Paris has partnered with Fikes Wholesale, Inc. (Owner of CEFCO) to rebuild 7"' Street <br />SW into a concrete roadway. Due to the heavy truck traffic, the asphalt roadway will not support <br />the heavy loads. Fikes Wholesale has agreed to split the cost 50/50 with the City to get this project <br />done. The partnership splits construction, geotechnical testing ($5895), and Yd party materials <br />testing during construction (Estimated to be $5000). <br />City of Paris called for bids for the project in the Paris News on May 6 and May 13, 2025. Bids <br />were opened on June 2, 2025 at 2:OOPM. Three responsive bids were received for the project. <br />Pridemore Construction, LLC from Paris, TX. was the Low Bidder, 2nd was Richard Drake <br />Construction from Paris, TX., 3rd was Drake General Contractors, LLC. <br />Low bid was $301,243.50. It is the City Engineer's recommendation to award the project to <br />Pridemore Construction, LLC of Paris, TX. <br />STATUS OF ISSUE: <br />Bid Analysis is attached for detailed information about the bid. <br />Pridemore Construction, LLC - $301,243.50 <br />Richard Drake Construction - $348,063.38 <br />Drake Companies, LLC - $377,096.79 <br />The project is located on 7t" Street SW from Loop 286 south to the CEFCO second entrance. This <br />will be a full depth concrete replacement project and is a 50/50 share with CEFCO South. <br />
The URL can be used to link to this page
Your browser does not support the video tag.