Laserfiche WebLink
4. Coordinators Report <br />a. Bedford met with Optimum and contacted AT&T regarding the underground services for the I st <br />Street project. A brick paver project was introduced. The total amount of bricks to be sold is 1296. <br />An example of the brick was present. In preparation for 903 Sun Set concert series, Water Oaks on <br />plaza were pruned, lighting was reinstalled and repaired. Imagine the Possibilities tour concluded. <br />Bedford and Hart met with Edwayne from Traffic re: painting crosswalks. A report to Council on <br />Vacant Building Registry will be made on June 23. A bike lane design for downtown has been <br />finalized. Hatch Chile Fest will be August 30. Salsa on the Square will be September 20. The 25th <br />Pumpkin Festival will be October 25. Will be contacting the SEDC for follow up on their surveys. <br />Committee needs to fill out their board member reports <br />5. Future Agenda Items: Need to revisit the transforming strategies when the full board is in attendance. <br />Also, discuss some special things to commemorate the 25th Pumpkin Festival. <br />6. Walker made a motion to adjourn the meeting. Hayden seconded. Motion passed. Board adjourned at <br />4:49 p. ni. <br />Chairman <br />