My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet
City-of-Paris
>
City Council
>
Agenda Packets
>
2025
>
07-28-2025
>
Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 11:45:12 AM
Creation date
7/24/2025 11:43:08 AM
Metadata
Fields
Template:
AGENDA
AGENDA - Type
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jointly1. The Contractor and Surety, r, <br />executors,themselves, their heirs, ♦ !, <br />Contract, which is incorporated herein by reference. <br />2. if the Contractor per -forms the Construction Contract, <br />Surety and the Contractor shall have no obligation under t <br />! ^♦:.hen anlicable to yarticiv-ate in a cc <br />provided in Paragraph 3. <br />3. if there is no Owner Default underthe Construction <br />the Surety's obligation under this Bond shall arise aftei I <br />3.1 The Owner first provides notice to the Contractor <br />and the Surety that the Owner is considering declaring <br /># ♦ M' ♦ ri <br />Owner is requesting a conference among the Owner, <br />Contractor, and Surety to discuss the Contractor's <br />performance. If the Owner does not request a conference, <br />requeststimely <br />the Owner agrees otherwise, any conference requested <br />Constructionunder this Paragraph 3.1 shall be held within ten (10) <br />If the Owner, the Contractor, and the Surety agree, the <br />"♦I <br />waive the Owner's right, if any, subsequently declare <br />ContractorDefault; <br />3.2 The Owner declares a Contractor Default, <br />terminates the Construction Contract and notifies the <br />Surety; and <br />3.3 The Owner has agreed to pay the Balance of tM <br />Contract Price in accordance <br />ConstructionM the Surety or to a contractor <br />selected♦ perform ! <br />Paragraph4. Failure on the part of the Owner to comply with the notice <br />requirement in ♦constitute <br />♦!extent the <br />Surety <br />demonstrates pr <br />5. When the Owner has satisfied the conditions of Paragraph 3, <br />the following <br />5.1 Arrange forthe Contractor, • <br />5.2 Undertake to perform and complete <br />Construction•ntract itself, through its agents or <br />independent <br />12 <br />5.3 Obtain bids or '! proposals from qualified <br />contractors ♦ the Owner forcontract <br />contractorOwner and a ! with the Owners <br />Contractorjigliging, to be secured with 4erformance and iagmen) <br />as a result of the M• or <br />5.4 Waive its right to perform ! complete, <br />for ! obtain ♦ ♦ : <br />, and with <br />reasonable promptness <br />5.4.1 <br />determine ♦ <br />which it may be liable to the Owner and, as soon <br />practicable after the amount <br />payment to the Owner; or <br />Owner,5.4.2 Deny liability in whole or in part and notify tM <br />denial. <br />! ' ♦ � 1i <br />V, litA is . ! ! ♦ <br />♦ ♦ ! <br />in part, without further notice the Owner shall <br />be entitled to <br />enforcee to the Owner. <br />those7. If the Surety elects to act under Paragraph 5.1, 5.2, or 5.3, <br />greater than +ntractor under the Construction <br />♦ !the Ownertothe <br />Contract.M the commitment by the Owner to pay the <br />r ♦ ! }�urep- is ♦! ! <br />duplication for: <br />7.1 the responsibilities of the Contractor for♦.., <br />of defective work and completion of the Construction <br />7.2 additional ♦ M and delay <br />•! ^ ! <br />Paragraphfrom the actions or failure to act of the Surety under <br />7.3 liquidated damages, or if no liquidated <br />!' "1 ! !:i <br />caused by delayed performance or non-performance of the <br />Contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.