My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet
City-of-Paris
>
City Council
>
Agenda Packets
>
2025
>
07-28-2025
>
Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 11:45:12 AM
Creation date
7/24/2025 11:43:08 AM
Metadata
Fields
Template:
AGENDA
AGENDA - Type
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATUS OF ISSUE: <br />Bid Analysis is attached for detailed information about the bid. <br />Wheeler Construction - $326,338.10 <br />Drake Companies, LLC - $326,605.51 <br />Richard Drake Construction - $355,809.10 <br />The project is located on 7th Street SW from Loop 286 south to the CEFCO second entrance. This <br />will be a full depth concrete replacement project and is a 50/50 share with CEFCO South. <br />The share of each partner is anticipated to be $168,616.55 for the project. Fikes Wholesale has <br />agreed to pay 50%, which will vary a small amount based on final project payments (which aren't <br />always exactly the same as bid amount, since payments are normally based on unit bid items which <br />could increase or decrease by minor amounts during construction), and final 3`d party <br />inspection/testing services during construction. <br />Project Timeline: Assuming approval by the council, the Contracts will be entered into with <br />Wheeler Construction in the next week, and construction will start in Early August. Construction <br />will take 35 calendar days, so that the work is completed by mid to late September. <br />The FY24/25 Budget has $2.5 million set aside for the Mill & Overlay project and this project. <br />The city's share will come from this account. This is remaining funding from the 2017 and 2018 <br />GO Bonds. Design was performed by City Engineering Staff using existing salaries. <br />OPTIONS <br />1. Grant approval for the City Manager to enter into a contract with Wheeler Construction for <br />the reconstruction of 7th Street SW into a concrete roadway. <br />2. Deny approval for the City Manager to enter into a contract with Wheeler Construction for <br />the reconstruction of 7th Street SW into a concrete roadway. <br />3. Reject all bids and request re -advertisement of project. <br />4. Request additional information regarding this issue and bring forth to a future meeting of <br />the city council. <br />RECOMMENDATION: <br />1. Grant approval for the City Manager to enter into a contract with Wheeler Construction for <br />the reconstruction of 7"' Street SW into a concrete roadway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.