Laserfiche WebLink
(E) Temp pole electric: $50.00. <br />(b) Engineering department fees. <br />(1) Site plan review: $120.00 an hour. <br />(2) Site permit: $100.00. <br />(3) Engineering inspections: $120.00 an hour. <br />(4) Grading permit: $250.00. <br />(5) Clearing permit (tree removal): $200.00. <br />(6) Right-of-way (ROW) - working in right-of-way: $100.00. <br />(7) Right-of-way (ROW) Abandonment: $200.00 1\1a curr nt i'(, -,e for this hype of request <br />(8) Third -party consultation, review or inspections: Actual cost. <br />(9) Platting. <br />(A) Preliminary plat. Will be a gradual increasing scale as follows: <br />(i) <br />1 lot: $300.00 per plat plus one dollar ($1.00) per lot. <br />(ii) <br />2-4 <br />lots: $300.00 per plat plus one dollar ($1.00) per lot. <br />(iii) <br />5-10 <br />lots: $500.00 per plat plus ten dollars ($10.00) per lot. <br />(iv) <br />11-15 <br />lots: $750.00 per plat plus ten dollars ($10.00) per lot. <br />(v) <br />16-20 <br />lots: $1,000.00 per plat plus fifteen dollars ($15.00) per lot. <br />(vi) <br />21-50 <br />lots: $1,500.00 per plat plus fifteen dollars ($15.00) per lot. <br />(vii) <br />51—over <br />lots: $2,000.00 per plat plus twenty dollars ($20.00) per lot. <br />(B) Final <br />plat. <br />(i) 1 lot: $300.00 per plat plus one dollar ($1.00) per lot. <br />(ii) 2-4 lots: $300.00 per plat plus one dollar ($1.00) per lot. <br />(iii) 5-10 lots: $500.00 per plat plus ten dollars ($10.00) per lot. <br />(iv) 11-15 lots: $750.00 per plat plus ten dollars ($10.00) per lot. <br />(v) 16-20 lots: $1,000.00 per plat plus fifteen dollars ($15.00) per lot. <br />(vi) 21-50 lots: $1,500.00 per plat plus fifteen dollars ($15.00) per lot. <br />(vii) 51—over lots: $2,000.00 per plat plus twenty dollars ($20.00) per lot. <br />