My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-011 - Ordinance amending Chapter 4, Article 4.02, “Construction Codes and Standards,” of the Code of Ordinances; repealing the adoption of the 2021 International Building Code
City-of-Paris
>
City Clerk
>
Ordinances
>
2026
>
2026-011 - Ordinance amending Chapter 4, Article 4.02, “Construction Codes and Standards,” of the Code of Ordinances; repealing the adoption of the 2021 International Building Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 4:20:37 PM
Creation date
4/29/2026 4:17:12 PM
Metadata
Fields
Template:
CITY CLERK
Doc Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(f) Installation testin and maintenance of backflow revention assemblies. <br />(1) All backflow prevention assemblies must be tested upon installation in accordance <br />with the manufacturer's instructions, Manual M14, or the University of Southern <br />California's Manual of Cross -Connection Control by a licensed backflow prevention <br />assembly tester and certified to be operating within specifications. Backflow <br />prevention assemblies that are installed to protect against health hazards must also <br />be tested and certified to be operating within specifications at least annually by a <br />recognized backflow prevention assembly tester. <br />(2) Assemblies must be repaired, overhauled, or replaced wheneverthe assemblies are <br />found to be defective. Original forms recording testing, repairs, and overhaul must <br />be kept and submitted to the city's designated electronic reporting system, through <br />the compliance engine within five working days of the test, repair or overhaul of <br />each backflow prevention assembly. <br />(3) Backflow prevention assemblies installed on fire suppression systems must be <br />tested by a backflow prevention assembly tester permanently employed by an <br />approved fireline contractor. <br />(4) No backflow prevention assembly or device may be removed from use, or <br />relocated, or other assembly or device substituted for it, without the approval of <br />the city's building safety department. <br />(5) Test results shall be registered and recorded with the city's designated electronic <br />reporting system. Completed forms shall be uploaded to city's designated <br />electronic reporting system within 10 days of test results. Test results shall be kept <br />on file for three (3) years. <br />(6) Gauges used for backflow prevention assembly testing must be tested for accuracy <br />at least annually in accordance with the AWWA's Manual M14 or the current <br />edition of the University of Southern California's Manual of Cross -Connection <br />Control. A copy of the gauge accuracy test report must be submitted to the city's <br />building safety department to demonstrate the gauge has been tested for accuracy. <br />(7) A recognized backflow prevention assembly tester must hold a current license <br />issued from the TCEQ and be registered with the city's building safety department. <br />(g) Repo of ins ections and tests. Records of all installations, inspections, tests and <br />maintenance required by this code shall be provided electronically to the compliance <br />engine which is the city's designated electronic reporting system. Completed records <br />shall be submitted no later than ten (10) days following the applicable Installation, <br />inspection, test and maintenance. The submitted report shall contain all information <br />required by the city's designated electronic reporting system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.