Laserfiche WebLink
approvals, permits, or authorizations and shall not take any action that would unreasonably hinder <br />Developer's efforts to obtain the same. The City's cooperation and assistance as described herein shall not <br />obligate the City to provide any financial contribution or financial assistance in connection with such <br />approvals or permits. Approval by the City Engineer under this Agreement may be evidenced by the <br />issuance of a permit by the City or by a written approval letter. Should the Eastern Segment Approved <br />Plans, the Western Segment Approved Plans, this Agreement, or other applicable written agreement(s) <br />between the Developer and the City conflict with applicable City ordinances and/or regulations, the <br />Developer, the City, and the TIRZ Board agree that the Eastern Segment Approved Plans, the Western <br />Segment Approved Plans, this Agreement, or other applicable written agreement(s) between the Developer <br />and the City shall govern with respect to the design and construction of the Forestbrook Blvd Project, <br />unless the Developer, the City, and the TIRZ Board agree otherwise in writing. Both the Forestbrook Blvd <br />Eastern Segment and the Forestbrook Blvd Western Segment shall be constructed with seven (7) inch <br />concrete of at least 3,000 PSI, reinforced with #4 rebar on an eighteen (18) inch grid pattern. The subgrade <br />shall be stabilized either by lime stabilization in accordance with a geotechnical report and City <br />specifications as of the Effective Date, not to exceed six percent (6%) lime and a one (1) foot overbuild, <br />or by either six (6) inches of TxDOT Flexbase #247 or six (6) inches of select fill with a plasticity index of 0- <br />15, with a one (1) foot overbuild, or as otherwise proposed by Developer and approved in writing by the City <br />Engineer. Construction of both Segments shall include the utilities and infrastructure set forth inthe Eastern <br />Segment Approved Plans and the Western Segment Approved Plans, including, to the extent reflected <br />therein, water utilities to service fire hydrants and landscaping irrigation located within the medians, water <br />line crossings for future development within the TIRZ, a storm drainage system, and electrical <br />infrastructure to power streetlights located within the medians. The size, capacity, location, and extent of <br />all such utilities and infrastructure shall be as set forth in the applicable Approved Plans. Sanitary sewer and <br />natural gas crossings shall be installed beneath both Segments per the Approved Plans during construction <br />to avoid the need for directional boring; provided, however, that installation of sanitary sewer and natural <br />gas main lines shall not be required for the construction of either Segment. Upon completion of <br />construction of each Segment, such Segment, together with all associated infrastructure constructed as part <br />of such Segment and reflected in the Approved Plans, including any required offsite improvements, shall <br />be dedicated to the City and shall be maintained by the City, with all ongoing operational and utility costs <br />associated therewith shall be the responsibility of the City. <br />(c) In accordance with Chapter 2253 of the Texas Government Code, the Developer <br />shall, prior to beginning construction on a Forestbrook Blvd Project or Segment of the Forestbrook Blvd <br />Project, cause its general contractor or general contractors to obtain payment and performance bonds, in <br />the whole amount of each prime contract, naming the City as the Obligee, in accordance with Chapter <br />2253 of the Texas Government Code for the Forestbrook Blvd Project or phase of the Forestbrook Blvd <br />Project in their respective contracts. The Developer shall obtain said bond in the event the general <br />contractor or general contractors fails to procure said bond. The Developer shall submit evidence of <br />payment andperformance bonds as a condition of entitlement to TIRZ Revenues under this Agreement. The <br />Developer shall submit the original payment and performance bonds to the City for inspection and retention <br />immediately upon obtaining them, and shall attach copies of the bonds as a condition of entitlement to <br />TIRZ Revenues under this Agreement. Without limiting other material breaches, failure of the Developer <br />to comply with this section or Chapter 2253 of the Texas Government Code is a material breach of this <br />Agreement, and the City may terminate this Agreement and exercise any and all remedies allowed under <br />law if not remedied by Developer within the Remedy Period as defined in Section 7.2(d). <br />(d) The Developer shall diligently proceed to supervise and construct the Forestbrook <br />Blvd Project and pay all costs related thereto substantially in accordance with applicable federal, state and <br />local laws and ordinances, and the plans and specifications approved by the appropriate department of the <br />4899-7656-8688.v12 <br />