Laserfiche WebLink
the same property. A Utility -Scale Solar Energy Facility may include ground -mounted <br />solar arrays, photovoltaic panels, racking systems, collector lines, inverters, <br />transformers, substations, switchgear, transmission or distribution infrastructure, Battery <br />Energy Storage Systems, maintenance buildings, access roads, security fencing, <br />supervisory control systems, and related accessory equipment. <br />A facility shall be considered utility -scale if it: <br />(a) occupies more than ten (10) acres of land area; or <br />(b) has a generating capacity exceeding five (5) megawatts alternating current (AC); or <br />(c) is developed primarily for off-site sale, wholesale power markets, utility <br />interconnection, or commercial energy generation rather than to serve a lawful principal <br />use on the same property. <br />Separate phases, contiguous tracts, leased areas, commonly controlled properties, or <br />related facilities developed as part of a common plan of development shall be <br />considered a single facility for purposes of determining applicability. <br />29.4 District eligibility. <br />(a) Utility -Scale Solar Energy Facilities may be considered only by approval of a <br />Specific Use Permit (SUP*) within the following zoning districts: <br />1. Light Industrial (LI); and <br />2. Heavy Industrial (HI). <br />(b) Utility -Scale Solar Energy Facilities shall not be permitted in any other zoning <br />district. <br />(c) Utility -Scale Solar Energy Facilities shall not be permitted in the Agricultural (A) <br />District. Property located in the Agricultural (A) District must first be rezoned to an <br />eligible zoning district before any Utility -Scale Solar Energy Facility may be considered. <br />(d) Rezoning of property from Agricultural (A) District or any other ineligible zoning <br />district to an eligible zoning district shall not create any entitlement to approval of a <br />Utility -Scale Solar Energy Facility. Any required SUP*, site plan, plat, engineering <br />approval, utility approval, building permit, fire permit, electrical permit, certificate of <br />occupancy or completion, development agreement, and other City approvals shall <br />remain independently required. <br />29.5 SUP* required. <br />(a) All Utility -Scale Solar Energy Facilities shall require approval of a SUP*. <br />