(e) will not prematurely convert land needed for orderly future growth, commercial
<br />development, residential development, public infrastructure, or community facilities;
<br />(f) has adequate access for fire, emergency medical services, police, public works,
<br />utility, and emergency response;
<br />(g) has or will provide adequate water, wastewater, stormwater, drainage, and
<br />transportation infrastructure;
<br />(h) provides sufficient information regarding electric service, electric infrastructure,
<br />backup power, generators, substations, transformers, fuel storage, cooling systems, and
<br />BESS, if applicable;
<br />(i) adequately mitigates noise, vibration, light, glare, heat, visual impacts, traffic, security
<br />fencing, exterior equipment, generator testing, fuel storage, and operational impacts;
<br />0) complies with DSM -002;
<br />(k) complies with the City's adopted BESS requirements when BESS is proposed;
<br />(1) complies with the City's adopted construction codes, fire code, electrical code,
<br />plumbing code, mechanical code, property maintenance code, Technical Standards
<br />Manual, Engineering Standard Details Book, utility standards, and other applicable
<br />technical standards;
<br />(m) provides acceptable decommissioning, site restoration, and adaptive reuse
<br />provisions as required by DSM -002; and
<br />(n) will not otherwise be detrimental to the public health, safety, or general welfare.
<br />§ 31-110. Approval criteria—P*.
<br />City Staff shall not approve a permit or application for a Data Center in a zoning district
<br />designated as P* unless the applicant shows that the proposed use:
<br />(a) is consistent with the Comprehensive Plan and Future Land Use Plan;
<br />(b) is located in a zoning district eligible for the proposed Data Center classification;
<br />(c) is compatible with surrounding existing and planned land uses;
<br />(d) will not materially impair existing or future residential, commercial, retail, mixed-use,
<br />public, institutional, park, open -space, or agricultural development areas;
<br />(e) will not prematurely convert land needed for orderly future growth, commercial
<br />development, residential development, public infrastructure, or community facilities;
<br />(f) has adequate access for fire, emergency medical services, police, public works,
<br />utility, and emergency response;
<br />Page 13 of 25
<br />
|