Laserfiche WebLink
(e) will not prematurely convert land needed for orderly future growth, commercial <br />development, residential development, public infrastructure, or community facilities; <br />(f) has adequate access for fire, emergency medical services, police, public works, <br />utility, and emergency response; <br />(g) has or will provide adequate water, wastewater, stormwater, drainage, and <br />transportation infrastructure; <br />(h) provides sufficient information regarding electric service, electric infrastructure, <br />backup power, generators, substations, transformers, fuel storage, cooling systems, and <br />BESS, if applicable; <br />(i) adequately mitigates noise, vibration, light, glare, heat, visual impacts, traffic, security <br />fencing, exterior equipment, generator testing, fuel storage, and operational impacts; <br />0) complies with DSM -002; <br />(k) complies with the City's adopted BESS requirements when BESS is proposed; <br />(1) complies with the City's adopted construction codes, fire code, electrical code, <br />plumbing code, mechanical code, property maintenance code, Technical Standards <br />Manual, Engineering Standard Details Book, utility standards, and other applicable <br />technical standards; <br />(m) provides acceptable decommissioning, site restoration, and adaptive reuse <br />provisions as required by DSM -002; and <br />(n) will not otherwise be detrimental to the public health, safety, or general welfare. <br />§ 31-110. Approval criteria—P*. <br />City Staff shall not approve a permit or application for a Data Center in a zoning district <br />designated as P* unless the applicant shows that the proposed use: <br />(a) is consistent with the Comprehensive Plan and Future Land Use Plan; <br />(b) is located in a zoning district eligible for the proposed Data Center classification; <br />(c) is compatible with surrounding existing and planned land uses; <br />(d) will not materially impair existing or future residential, commercial, retail, mixed-use, <br />public, institutional, park, open -space, or agricultural development areas; <br />(e) will not prematurely convert land needed for orderly future growth, commercial <br />development, residential development, public infrastructure, or community facilities; <br />(f) has adequate access for fire, emergency medical services, police, public works, <br />utility, and emergency response; <br />Page 13 of 25 <br />