Laserfiche WebLink
mechanical, cooling, security, fire protection, backup power, fuel, battery energy <br />storage, utility, and support infrastructure. <br />High-intensity Data Center. -A Data Center classified under DSM -002 as a hyperscale <br />data center, artificial intelligence data center, high-performance computing facility, data <br />center campus, large colocation data center, or other high -load or high -impact Data <br />Center use due to scale, electrical demand, water or wastewater demand, cooling <br />requirements, exterior equipment, generator capacity, fuel storage, BESS use, <br />substation requirements, or similar characteristics. <br />Limited Data Center. -A Data Center classified under DSM -002 as a limited -scale, <br />small-scale, adaptive reuse, edge, enterprise, or similar lower -impact Data Center use <br />that is located within an existing lawful building or otherwise determined to have limited <br />land use, utility, noise, cooling, exterior equipment, power, generator, fuel, and <br />infrastructure impacts. <br />Material Change. A change to an approved Data Center development, facility, <br />operation, or associated infrastructure that materially changes the approved <br />development or its impacts and may require additional review or approval under this <br />Section, DSM -002, or other applicable City regulations. <br />Materially Changes. To alter, modify, replace, expand, intensify, or otherwise affect a <br />Data Center facility, operation, or associated infrastructure in a manner that may <br />reasonably increase or change its impacts on public health, safety, welfare, <br />infrastructure, utility demand, emergency response, environmental conditions, or <br />compliance with applicable regulations. Routine maintenance, repairs, replacement of <br />equipment with substantially equivalent equipment, software or firmware updates, and <br />other activities that do not increase or significantly alter operational impacts shall not <br />constitute a material change. <br />Operational Intensification. An increase in the operational characteristics of a Data <br />Center, including electrical demand, cooling capacity, water demand, wastewater <br />generation, equipment density, generator capacity, Battery Energy Storage System <br />capacity, or similar operational characteristics that may increase impacts on public <br />infrastructure or surrounding properties. <br />Permitted with Standards (P*). A land use permitted by right within the applicable <br />zoning district, provided the development complies with this Section, DSM -002, all <br />applicable City regulations, approved development plans, and all other required permits <br />and approvals. <br />Substantial Modification. Any physical expansion, reconstruction, alteration, <br />replacement, or operational change to a Data Center or associated infrastructure that <br />materially changes the approved site layout, building area, utility demand, cooling <br />Page 8 of 26 <br />