Laserfiche WebLink
<br />meter shall be repaired by a service representative qualified to work on the meter being repaired. In <br />the event the meter must be replaced, CITY will determine a replacement meter and the method of <br />replacement. The cost of maintenance or repair will be distributed in accordance with Paragraph 4.1. <br /> <br />6.3 The CITY'S representative assisted by a service representative qualified to work on the <br />meter being repaired, will annually during each calendar year, test the accuracy and performance of <br />the meter and will calibrate the meter measuring PARTNERSHIP'S consumption, to verify its <br />accuracy. The CITY may, at its discretion, choose to calibrate the meter more frequently, if <br />conditions so warrant. The cost of the calibration will be distributed in accordance with paragraph <br />4.1. A representative ofP AR TNERSHIP will be notified in advance of any testing and! or calibration <br />and shall have the right to witness any such testing. All testing will be performed by a qualified <br />representative or mutually agreed upon testing service. <br /> <br />6.4 When it is determined that the water meter has registered incorrectly, an estimate of the <br />amount of water furnished through the faulty meter shall be prepared by CITY'S Director of <br />Finance for the purpose of billing PARTNERSHIP. The estimate shall be based upon such method <br />(such as a water usage measurement correlated to actual electrical generation) which would most <br />accurately reflect the actual consumption for the period in which the meter failure occurred as <br />mutually agreed upon by the City Manager and Plant Manager of the respective parties. <br /> <br />6.5 For the meter to be determined as "registering incorrectly," the meter must be found to <br />be in error by plus or minus 2.5%, or greater. If the degree of error is plus or minus 2.5%, or greater, <br />then the estimated amount of water furnished to PARTNERSHIP will be calculated as stated in the <br />immediately preceding paragraph. <br /> <br />VII. <br /> <br />Rates <br /> <br />7.1 For purposes of billing under this Agreement, a day shall be that period of time beginning <br />at 12:00 midnight and continuing through 11 :59 p.m. <br /> <br />7.2 PARTNERSHIP will be charged a two-part rate based on PARTNERSHIP'S treated <br />water consumption and Maximum Day Demand. <br /> <br />7.3 Charges for treated water furnished to PARTNERSHIP during the Initial Period of this <br />Agreement shall be from the date of execution through May 31, 2006 and have been computed as <br />follows: <br /> <br />7.3.1 An annual demand charge per million gallons per day (MGD) of Maximum Day <br />Demand of water delivered to PARTNERSHIP shall be $95,228 per MGD. <br /> <br />7.3.2. The volumetric charge shall be $0.60 per 100 cubic feet of treated water withdrawn <br />by PARTNERSHIP from the CITY'S water utility system. <br /> <br />Tenaska III Water Service Contract - Page 4 <br /> <br />. T-' <br />