Laserfiche WebLink
<br /> Length or <br />Description Measurement Manufactor Quantity Price Total Price <br />8" C-900 PVC LF N/A 1015 $9.52 $9,662.80 <br />6" TS& V EACH N/A 1 $1,100.00 $1,100.00 <br />6" 22 1/2 Bend EACH N/A 1 $110.00 $110.00 <br />8x6 Reducer EACH N/A 2 $125.00 $250.00 <br />8" Gate Valve EACH N/A 1 $580.00 $580.00 <br />8" 22 1/2 Bend EACH N/A 1 $110.00 $110.00 <br />8"Tee EACH N/A 1 $240.00 $240.00 <br />8" Cap EACH N/A 1 $90.00 $90.00 <br />6" Gate Valve EACH N/A 1 $400.00 $400.00 <br />Fire Hydrant EACH N/A 1 $1,400.00 $1,400.00 <br />Asphalt Street Repair LF N/A 22 $10.00 $220.00 <br />Embedment Material TN N/A 175 $10.00 $1,750.00 <br />Unknown Conditions LS N/A 10% $1,591.28 <br /> TOTAL MATERIALS COST $17,504.08 <br /> <br /> Length or <br />Description Measurement Manufactor Quantity Price Total Price <br />6" C-900 PVC LF N/A 1015 $5.50 $5,582.50 <br />6"TS&V EACH N/A 1 $1,100.00 $1,100.00 <br />6" 22 1/2 Bend EACH N/A 2 $110.00 $220.00 <br />6" Gate Valve EACH N/A 2 $400.00 $800.00 <br />6"Tee EACH N/A 1 $152.00 $152.00 <br />6" Cap EACH N/A 1 $10.00 $10.00 <br />Fire Hydrant EACH N/A 1 $1,400.00 $1,400.00 <br />Asphalt Street Repair LF N/A 22 $10.00 $220.00 <br />Embedment Material TN N/A 175 $10.00 $1,750.00 <br />Unknown Conditions LS N/A 10% $1,123.45 <br /> TOTAL MATERIALS COST $12,357.95 <br /> <br />LABOR PRICE QUANTITY TOTAL <br />3 MAN CREW $33.00 80 $2,640.00 <br />SS--TMRS--WC--HI 33.00% 0.33 $871.20 <br />ADMIN. & SUPER. $15.71 10 $157.10 <br />SS-- TMRS--WC--HI 33.00% 0.33 $51.84 <br />TRAFFIC CONTROL $50.00 2 $100.00 <br /> LABOR TOTAL $3,820.14 <br /> <br />EQUIPMENT PRICE QUANTITY TOTAL <br />PICKUP $15.00 80 $1,200.00 <br />BACKHOE $40.00 60 $2,400.00 <br />DUMP TRUCK $40.00 40 $1,600.00 <br /> EQUIPMENT TOTAL $5,200.00 <br /> <br />TOTAL 8" COST WI <br />ENGINEERING FEE $29,176.65 <br />TOTAL 6" COST WI <br />ENGINEERING FEE $23,515.90 <br /> <br />PRICE PER FOOT FOR 6" $11.58 <br />