Laserfiche WebLink
<br />SCHEDULE F <br /> <br />Installation and Traininf.! <br /> <br />1. Traininf.!. <br /> <br />1.1. Eight (8) days of on-site key-operator training, training materials, and support in the use of <br />~uipment and software for a maximum of 10 people per trainer at $600 per trainer per day <br />plus actual travel expenses. The library should plan on one terminal for every two trainees. <br /> <br />1.1.1. One Trainer for 8 days: <br /> <br />$4,800 <br /> <br />1.1.2. Estimated Expenses <br /> <br />S2,000 <br /> <br />2. Installation. <br /> <br />2.1. On-site installation of all hardware and software by Gaylord technician(s) who will unpack, <br />connect, and test all equipment, (@ $600 per technician per day plus actual expenses). * <br /> <br />2.1.1. One Technician for 2 days: <br /> <br />S 1 ,200 <br /> <br />2.1.2. Estimated expenses <br /> <br />S700 <br /> <br />* Library will provide and run all cables <br /> <br />Total Installation and Traininf.! (Estimated): S8,700 <br /> <br />06/03/94 Paris Public Library Contract P 17 of 22 <br />