My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-048-RES WHEREAS, CITY COUNCIL DID HERETOFORE ON THE 9TH DAY OF MARCH
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1998
>
1998-048-RES WHEREAS, CITY COUNCIL DID HERETOFORE ON THE 9TH DAY OF MARCH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:30:35 PM
Creation date
2/28/2006 3:10:44 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1998-048-RES
Doc Type
Resolution
CITY CLERK - Date
4/13/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />...... . ~ .:,...~ . , <br />. .....~.~ -":"- ....; .... ...:~.~.......:...~";,.', ': - - .... .....: ..... <br /> <br />" '.', ,.. <br />'~ ' ,...,.'~-."..-_" ;-._..,w:....... .. <br /> <br />~ <br /> <br />THIS AGREEMENT is dated as of the ni-h day of APT; 1 <br />the year 19 96 by and between Ci ty o~ Paris, Paris, <br />(hereinafter called OWNER) and DT:llrP r.nn~tTl1,.tinn"r.nmp;my, Tn~. <br />(hereinafter called CONTRACTOR). <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set-forth, 'agree as follows: <br /> <br />in <br />Texas, <br /> <br />Article 1. WORK. <br /> <br />CONTRACTOR shall complete all Work as specified or indicated in the <br />Contract Documents. The Work is generally described as follows: <br />1560 L.F. of concrete curb and gutter, 780 L.F. of 42 inch RCP <br />storm sewer, 2425 S. Y. Asphalt level-up and HMAC overlay and <br />approximately 2600 L.F. of right-of-way preparation including <br />clearing, grubbing, and grading with other appurtenant <br />construction, complete in place. <br /> <br />The Project for which the Work under the Contract Documents may be <br />the whole or only a part is generally described as follows: <br />Street and Drainage Improvements, 6th Street N.E. from E. Garrett <br />to Martin Luther King Jr. Dr., Clearing, Grubbing, and Grading of <br />Martin Luther King Jr. Dr., from 6th Street N.E. to North Main. <br /> <br />Article 2. ENGINEER. <br /> <br />The Project has been designed by City Engineer, City of Paris, <br />Paris, Texas, or his authorized representative, who is hereinafter <br />call ENGINEER and who is to act as OWNER'S representative, assume <br />all duties and responsibilities and have the rights and authority <br />assigned to ENGINEER in the Contract Documents in connection with <br />completion of the Work in accordance with the Contract Documents. <br /> <br />Article 3. CONTRACT TIME. <br /> <br />3.1 The Work will be substantially completed within -120 days <br />..from_ the_date when the Contract Time commences to.run as provided <br />in paragraph 2.3 of the General Conditions, and completed and ready <br />for final payment in accordance with paragraph 14.13 of General <br />Conditions within ~ days from the date when the Contract Time <br />commences to run. <br /> <br />.~ <br />.---- <br /> <br />3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time <br />is of the essence of this Agreem~nt and that OWNER will suffer <br />financial loss if the Work is not completed within the times. <br />specified in paragraph 3.1 above, plus any extensions thereof <br />allowed in accordance with Article 12 of the General Conditions. <br />They also recognize the delays, expense and difficulties involved <br />in proving in a legal or arbitration proceeding the actual loss <br />suffered by OWNER if the Work is not completed on time. <br />Accordingly, instead of requiring any such proof, OWNER and <br /> <br />19 <br /> <br />~. <br /> <br />~HIBll A <br />
The URL can be used to link to this page
Your browser does not support the video tag.