My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-033-RES WHEREAS, the City Council of the City of Resolution No. 90-029 on March 12, 1990 advertisement for bids
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1990
>
1990-033-RES WHEREAS, the City Council of the City of Resolution No. 90-029 on March 12, 1990 advertisement for bids
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:33:33 PM
Creation date
3/1/2006 12:07:10 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1990-033-RES
Doc Type
Resolution
CITY CLERK - Date
4/9/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
View images
View plain text
<br />7.3 CONTRACTOR has obtained and carefully studied (or <br />assumes responsibility for obtaining and carefully <br />studying) all such examinations, investigations, <br />explorations, tests, reports and studies (in additions <br />to or to supplement those referred to in paragraph 7.2 <br />above) which pertain to the subsurface or physical <br />conditions at or contiguous to the site or otherwise may <br />affect the cost, progress, performance or furnishing of <br />the Work at the Contract Price, within the Contract Time <br />and in accordance with the other terms and conditions of <br />the Contract Documents, including specifically the <br />provisions of paragraph 4.2 of the General Conditions; <br />and no additional examinations, investigations, <br />explorations, tests, reports, studies or similar <br />information or data are or will be required by <br />CONTRACTOR for such purposes. <br /> <br />7.4 CONTRACTOR has reviewed and checked all information <br />and data shown or indicated on the Contract Documents <br />with respect to existing Underground Facilities at or <br />contiguous to the site and assumes responsibility for the <br />accurate location of said Underground Facilities. No <br />additional examinations, investigations, explorations, <br />tests, reports, studies or similar information or data <br />in respect of said Underground Facilities are or will be <br />required by CONTRACTOR in order to perform and furnish <br />the Work at the Contract Price, within the Contract Time <br />and in accordance with the other terms and conditions of <br />Contract Documents, including specifically the provisions <br />of paragraph 4.3 of the General Conditions. <br /> <br />7.5 CONTRACTOR has correlated the results of all such <br />observations,examinations, investigations,explorations, <br />tests, reports and studies with the terms and conditions <br />of the Contract Documents. <br /> <br />7.6 CONTRACTOR has given ENGINEER written notice of all <br />conflicts, errors or discrepancies that he has discovered <br />in the Contract Documents and the written resolution <br />thereof by ENGINEER is acceptable to CONTRACTOR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).