Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br />7.3 CONTRACTOR has obtained and carefully studied (or <br />assumes responsibility for obtaining and carefully <br />studying) all such examinations, investigations, <br />explorations, tests, reports and studies (in additions <br />to or to supplement those referred to in paragraph 7.2 <br />above) which pertain to the subsurface or physical <br />conditions at or contiguous to the site or otherwise may <br />affect the cost, progress, performance or furnishing of <br />the Work at the Contract Price, within the Contract Time <br />and in accordance with the other terms and conditions of <br />the Contract Documents, including specifically the <br />provisions of paragraph 4.2 of the General Conditions; <br />and no additional examinations, investigations, <br />explorations, tests, reports, studies or similar <br />information or data are or will be required by <br />CONTRACTOR for such purposes. <br /> <br />7.4 CONTRACTOR has reviewed and checked all information <br />and data shown or indicated on the Contract Documents <br />with respect to existing Underground Facilities at or <br />contiguous to the site and assumes responsibility for the <br />accurate location of said Underground Facilities. No <br />additional examinations, investigations, explorations, <br />tests, reports, studies or similar information or data <br />in respect of said Underground Facilities are or will be <br />required by CONTRACTOR in order to perform and furnish <br />the Work at the Contract Price, within the Contract Time <br />and in accordance with the other terms and conditions of <br />Contract Documents, including specifically the provisions <br />of paragraph 4.3 of the General Conditions. <br /> <br />7.5 CONTRACTOR has correlated the results of all such <br />observations,examinations, investigations,explorations, <br />tests, reports and studies with the terms and conditions <br />of the Contract Documents. <br /> <br />7.6 CONTRACTOR has given ENGINEER written notice of all <br />conflicts, errors or discrepancies that he has discovered <br />in the Contract Documents and the written resolution <br />thereof by ENGINEER is acceptable to CONTRACTOR. <br />