Laserfiche WebLink
<br />1. 2.4. Provide smoke testing and other field services as further described <br />in Exhibit A hereto. <br /> <br />The duties and responsibilities of ENGINEER during the System Inspection <br />Phase are amended and supplemented as indicated in Exhibit A "Further <br />Description of Basic Engineering Services and Related Matters". <br /> <br />1.3. ~reliminary Design & Field Surveys Phase <br /> <br />After written authorization to proceed with this phase, ENGINEER shall: <br /> <br />1.3.1. Perform on-the-ground surveys to develop more detailed drawings <br />for certain portions of the project, as further described in Exhibit A <br />hereto. <br /> <br />1.3.2. Advise OWNER if additional data or services of the types <br />described in paragraph 3.4. are necessary and assist OWNER in obtaining <br />such data and services. <br /> <br />1.4. Final Design Phase <br /> <br />After written authorization to proceed with the Final Design Phase, <br />ENGINEER shall: <br /> <br />1.4.1. On t.he basis of the accepted preliminary documents and the <br />opinion of probable Total Project Costs prepare for incorporation in the <br />Contract Documents final drawings to show the general scope, extent and <br />character of the work to be furnished and performed by CONTRACTOR(S) <br />(hereinafter called "Drawings") and Technical Specifications. <br /> <br />1.4.2. Provide technical cri teria, written descriptions and design data for <br />OWNER'S use in obtaining approvals of such governmental authorities as <br />have jurisdiction to approve the design of the Project, and assist OWNER <br />in consultations with appropriate authorities. <br /> <br />1.4.3. Advise OWNER of any adjustments to the latest opinion of <br />probable Total Project Costs caused by changes in general scope, extent <br />or character or design requirements of the Project or Construction Costs. <br />Furnish to OWNER a revised opinion of probable Total Project Costs <br />based on the Drawings and Specifications. <br /> <br />1.4.4. Prepare for review and approval by OWNER, its legal counsel and <br />other advisors contract agreement forms, general conditions, and <br />supplementary conditions, and bid forms, invitations to bid and <br />instructions to bidders and assist in the preparation of other related <br />documents. <br /> <br />1.4. 5. Furnish two copies of the above documents and of the Drawings <br />and Specifications and present and review them in person with OWNER. <br />Three additional copies will be furnished by the ENGINEER to the <br />appropriate review agencies. <br /> <br />Page 2 of 17 Pages <br />