My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-075-RES-LAMAR CO. WATER SUPPLY DISTRICT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2006
>
2006-075-RES-LAMAR CO. WATER SUPPLY DISTRICT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:26:32 PM
Creation date
5/10/2006 11:56:41 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2006
Doc Type
Resolution
CITY CLERK - Date
5/8/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />For Phase 2, the Capacity Charge will additionally incorporate the <br />direct assignment to LCWSD of the capital costs reflective of <br />increasing the Maximum Hour Capacity Demand from 395,820 <br />gallons per hour (gph) to 499,980 gallons per hour (gph). Capital costs <br />incurred for increases in Rated Plant Capacity not associated with <br />maintaining the Initial Rated Plant Capacity or not associated with the <br />provision of Treated Water to LCWSD shall not be assigned to <br />LCWSD. Unless mutually agreed upon by the Parties, the Maximum <br />Hour Capacity Demand applied in the Capacity Charge determination <br />will not exceed the Maximum Hour Capacity Demand as provided in <br />Article 2.4 of this Agreement. <br /> <br />5. Water Treatment Plant Demand Charge. Allocation for the Demand <br />Charge for the Treated Water produced by the City for LCWSD from <br />the Water Treatment Plant will be based on the Test Year Maximum <br />Day Metered Demand at the delivery points as identified in Article <br />2.3, adjusted for lost and unaccounted for water, as provided in Article <br />2.3, and known and measurable changes. <br /> <br />6. Water Distribution Demand Charge. Allocation for the Demand <br />Charge for Treated Water delivered through the Water Distribution <br />System will be based on the Test Year Distribution Maximum Day <br />Metered Demand, adjusted for known and measurable changes. <br /> <br />7. Water Treatment Plant Volume Charge. Allocation for the Volume <br />Charge for the Treated Water produced by the City for LCWSD from <br />the Water Treatment Plant will be based on the Test Year total water <br />consumption for LCWSD as measured at the delivery points identified <br />in Article 2.3, adjusted for lost and unaccounted for water, as provided <br />in Article 2.3, and known and measurable changes. <br /> <br />8. Water Distribution Volume Charge. Allocation for the Volume <br />Charge for Treated Water delivered through the Water Distribution <br />System will be based on the total water delivered through the Water <br />Distribution System, adjusted for known and measurable changes. <br /> <br />d. Review and Update of Cost Methodology. On or before June 1,2010 and <br />every five years thereafter during the tenn of this Agreement, the cost <br />methodologies contained in the Water Rate Study will be reviewed by Paris <br />and LCWSD. The cost methodologies may be modified by agreement of the <br />Pmiies to reflect changed circumstances, change regulatory requirements, and <br />to ensure that Paris is recovering the cost of providing service under this <br />Agreement. If the Parties are unable to reach agreement concerning <br />modification of cost methodologies within one hundred twenty (120) days <br />following the first meeting between the Parties to review such cost <br /> <br />13 Paris/LCWSD Wholesale Treated Water Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.