My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-E Prelim Plat Neadow Park Add Phase IV
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2006
>
06 June
>
2006-06-12
>
02-E Prelim Plat Neadow Park Add Phase IV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 10:39:51 AM
Creation date
6/7/2006 10:39:51 AM
Metadata
Fields
Template:
AGENDA
Item Number
02-E
AGENDA - Type
MISCELLANEOUS
Description
Preliminary Plat for Meadow Park Addition Phase IV, 4400 Blk of Bonham St.
AGENDA - Date
6/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMORANDUM <br /> <br />TO: Mayor anfi Council <br /> Planning d i' ing Commission <br />FROM: Shawn Napler, P. <br /> City Engin~ It <br /> '. <br />DATE: June 2, 2006 <br />SUBJECT: Meadow Park Addition Phase IV <br /> <br />I have reviewed the preliminary plat of the above referenced addition. It appears that the <br />preliminary plat complies with the City of Paris subdivision regulations with the following <br />exceptions. <br /> <br />1. Provide an off-site drainage easement from the proposed Choctaw Lane going east <br />toward the creek. <br />2. Move the fire hydrant on the south side of lot 7, Block 'A' to the north side of lot 7 to <br />avoid the franchise utilities in the east-west easement. <br />3. Show all trees that are over I9-inches in diameter. <br />4. The creek that flows through Block C, Lot 1 shall be at least concrete lined per the City <br />of Paris Code of Ordinances, Appendix B-Subdivision Regulations, Section VIII. E. <br />Drainage. <br />S. Provide a drainage easement for the creek. <br />6. Provide the creek top of bank locations and bottom widths. <br />7. Provide elevations for the contour lines and provide elevations on Block C, Lot 1. <br />8. The front 1/3 of the development is currently zoned Agriculture. This area will need to <br />be rezoned to SF-2. <br />9. Provide construction plans to the Engineering Department. <br /> <br />I recommend approval of the preliminary plat upon completion of the above items. <br /> <br />cc: Tony N. Williams, City Manager <br />Lisa Wright, Director of Community Development <br />Brandon Chaney, P.E., R.P.L.S., Chaney Engineering Inc. <br />Gene McWaters <br /> <br />r" <br />
The URL can be used to link to this page
Your browser does not support the video tag.