Laserfiche WebLink
<br />SLUDGE PUMP OPERATION <br /> <br />1.) START PUMP CLEAR WATER - lRST 5 MINUTES(MINIMUM). <br />2.) FINISH - CLEAR WATER - LAST 5 MINUTES (MINIMUM). <br /> <br />DAY: <br /> <br />DATE: <br /> <br />TANK SPRAYED FROM: <br /> <br />DEPTH (FT./IN.) FROM TOP OF THICKENER TO LIQUID LEVEL AT START: <br /> <br />DEPTH (FT./IN.) FROM TOP OF THICKENER TO LIQUID LEVEL AT END: <br /> <br />START/STOP TIME EFFLUENT: <br />START TIME - SLUDGE: <br /> <br />/ <br /> <br />STOP TIME - SLUDGE: <br /> <br />START/STOP TIME EFFLUENT: / <br /> <br />(BASED ON TOTAL SLUDGE <br />GPM: SPRAYED AND TIME) <br /> <br />TOTAL SLUDGE SPRAYED: <br /> <br />TOTAL EFFLUENT SPRAYED: <br /> <br />MOTOR AMP CHECK: <br /> <br />PUMP PRESSURE CHECK: <br /> <br />(WP51\SLUDGE\SLUDGE-OP) <br /> <br />F-2 <br />