Laserfiche WebLink
<br />, .' <br /> <br />:. .".. : . <br /> <br />550.4 <br /> <br />- <br /> <br />550.4 <br /> <br />.~ <br /> <br />~ <br /> <br />Construction Methods <br />It is intended to fence the entire <br />perimeter of the project site. Included, <br />herein, is a copy of the ~ite boundaries <br />prior to construction of the drainage <br />basin. It is included to show the contractor <br />the site location and general scope of work. <br />The contractor shall remove the existing <br />barbed wire fence along the western property <br />line and clear the fence line of brush in <br />preparation for installing the new chain link <br />fence. <br />The old fence posts and wire fence shall <br />be salvaged and relocated to a site within <br />the city limits of Paris as directed. <br />No trees will be required to be removed <br />by this contractor. <br /> <br />POSTHOLES <br />(b) postholes shall be a mlnlmum 9" <br />diameter and shall be backfilled with <br />3000 psi (5 sack mix) concrete. <br />Terminal post spacing shall be a maximum <br />300 feet spacing. <br />Terminal posts shall have embedment <br />depth of 3 feet. <br />Line posts shall have embedment depth of <br />2 feet. <br />Electrical .grounding of fence is not <br />required. <br />