Laserfiche WebLink
<br />, - ., <br />'''-...- - <br /> <br />DEI AILED BUDGET SHEET 6: Grant-Funded Construction <br /> <br />This budget sheet should be completed if any expenses are entered for construction on Line 6 <br />of your Grant Budget SummaT)'. <br /> <br />Expenses budgeted under this category should be for costs related to the enhancement or <br />building of pennanent facilities. No construction costs shall be incurred by a pass-through <br />grant recipient unless the constrUction details are approved in advance by the A TCOO. <br />Appropriate costs that may be included are: <br /> <br />a The cost of planning the project; <br />b. The cost of materials and labor connected to the construction project; <br />c. The cost of equipment anached to the permanent structure; and <br />d. Any subcontracts, including contracts for services, performed as part of the <br />construction. <br /> <br />In the space below, please describe the construction expenses associated \\;th the proposed <br />project, providing as many spedfications as possible at this time (please identify any services <br />to be subcontracted): <br /> <br />We are requesting the following materials in our grant request: <br /> <br />1. 778 tons of black base (2" overlay of 300' x 300' area) at $30.00 per ton <br />which equals 523,340.00 <br /> <br />2. 2,000 gallons of oil (for treatment of millings and rock base material) at <br />0.6426 per gallon which equals $1,285.20 <br /> <br />The cost of equipment and labor will be furnished by the City of Paris and is <br />explained in the in-kind section on pages 7 and 11. <br /> <br />1 7 <br />