Laserfiche WebLink
<br />5. 8" Watennain Clarksville, <br /> 8th S.E. to 17th S.E. 'I $ 500,000 <br />6. 12" Watermain West Campbell, <br /> 19th N.W. to 29th N.W. $ 225,000 <br />7. S.W. Loop 286 Old Bonham Rd to FM 137 12" $ 330,000 <br />8. 12" Watermain ] st N.W., <br /> Graham to Santa Fe S 240,000 <br />9. 12" \Vatennain North Loop 286, <br /> at McCuistion Hospital $ 150,000 <br />10. South Loop 286 7th S.W. to FM 1497 12" S 165,000 <br />11. Paradise Est Sub. Water Service S 115,000 <br />12. N.E. Loop 286 Still house Rd to Clement Rd 10" $ 140,000 <br />13. Fire Hydrants Install where needed 40 each $ 80,000 <br />14. 8" Watermain Highway 24 South, <br /> 2100 Block to 2400 Block $ 75,000 <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />S3,495,875 <br /> <br />ENGINEERING FEES <br /> <br />279,670 <br /> <br />OTHER ENGINEERING <br /> <br />87,396 <br /> <br />LEGAL <br /> <br />34,958 <br /> <br />TOTAL \V A TER DISTRIBUTION SYSTEM <br /> <br />$3,897,899 <br />