Laserfiche WebLink
<br />RESOLUTION NO. 98-063 <br /> <br />WHEREAS, the City Council of the City of Paris did heretofore, on the 9th day of <br />December, 1996, in Resolution No. 96-139, award the contract for "Wastewater Treatment Plant <br />Clarifier and Sludge Processing Facilities," Project No. 92- WSRBO 1-96, to Gracon Construction, <br />Inc.; and, <br /> <br />WHEREAS, the City Engineer, Earl Smith, acting as project engineer, recommends the <br />amendment of the contract for said project as follows: (I) select fill under the clarifier; (2) oil <br />coolers for the spray field pumps; (3) level sensors for the sludge holding tanks; (4) ball check <br />valves in the wetwells; (5) plug valve in 4" line to the AT AD building; (6) Pre-AT AD holding <br />tank level indicator; (7) larger conduit at the wetwells; (8) thermal overloads for the 6 Flygt <br />pumps; and (9) networking cable for the two AT AD controllers; which provides for a net increase <br />of $23,097.18 in the contract price, for a total contract price of $3,821,097.18 and a net increase <br />of contract time of 155 days, for a total contract time of 485 days; and, <br /> <br />WHEREAS, the form of Change Order No. One (I), attached hereto as Exhibit A, <br />should, in all things, be approved, and the Mayor, Charles H. Neeley, should be authorized to <br />execute the same; NOW, THERE~'ORE, <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that the <br />form of Change Order No. One (l) to the Contract for the "Wastewater Treatment Plant Clarifier <br />and Sludge Processing Facilities," Project No. 92-WSRBO 1-96, attached hereto as Exhibit A, <br />which amends the contract as follows: (l) select fill under the clarifier; (2) oil coolers for the <br />spray field pumps; (3) level sensors for the sludge holding tanks; (4) ball check valves in the <br />wetwells; (5) plug valve in 4" line to the AT AD building; (6) Pre-AT AD holding tank level <br />indicator; (7) larger conduit at the wetwells; (8) thermal overloads for the 6 Flygt pumps; and (9) <br />networking cable for the two ATAD controllers; which provides for a net increase of $23,097.18 <br />in the contract price, for a total contract price of $3,821 ,097.18 and a net increase of contract time <br />of 155 days, for a total contract time of 485 days, be, and the same is hereby, approved; and, <br /> <br />BE IT FURTHER RESOLVED, that the Mayor, Charles H. Neeley, be, and he is hereby <br />authorized and directed to execute, on behalf of the City of Paris, said Change Order No. One (1), <br />upon the terms and conditions and in the form shown in Exhibit A, attached hereto. <br /> <br />PASSED AND ADOPTED this 11th day of May, 1998. <br /> <br />Charles H. Neeley, Mayor <br /> <br />