My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-095-RES-UARCO BUILDING TO NEW POLICE COURT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2006
>
2006-095-RES-UARCO BUILDING TO NEW POLICE COURT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:26:36 PM
Creation date
7/13/2006 8:17:41 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2006
Doc Type
Resolution
CITY CLERK - Date
7/10/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />rage 1 01 1 <br /> <br />Don Morris <br /> <br />From: Roger Bussell [rbussell@webuild-hwh.com] <br />Sent: Wednesday, March 29, 200612:26 PM <br />To: Don Morris <br />Cc: Steve Hunt <br />Subject: Substantial Completion <br /> <br />Steve advised me today that you need an official request from HWH in order to process the Certificate of <br />Substantial Completion. I apologize for the delay in this as I assumed after we talked on the 23rd the ball was <br />rolling on this. No problem. <br /> <br />HWH believes that effective 3-23-06 we are substantially complete with the Paris Police project. At this time all <br />doors and locks are installed and security features are functioning properly. All flooring, ceilings and equipment is <br />installed and operational. We are currently working with the City on the final programming of the security systems, <br />Le.. installing employee names. The building is currently operating through the card reader system. <br /> <br />Following is a list of items we are currently working on: <br /> <br />1). Final paint touch-up through-aut-to be completed by 3-31-06 <br />2). Replacement of 5 doors damaged during installation--to arrive 3-29-06 <br />3). Installation of access gate at Generatorrrransformer area---scheduled for 3-31-06 <br />4). Installation of Card Reader at Gate Controller-scheduled for 3-30-06 <br />5). Adjusting doors and hdwe, installation of signage <br />6). Cleaning of site/removal of construction debris <br />7). Installing Steel cables at Court Entrance-scheduled for 3-31-06 <br />8). Removal of construction materials from "WHSE" area. <br />9). Placing all building keys in the key box-will transmit to City 3-31-06 <br />10). Punch list <br /> <br />Furthermore we have scheduled one more final clean to take place on 4-7-06 prior to the ribbon cutting <br />ceremony. <br /> <br />We have allowed the city to start moving in their supplies, files, boxes etc..based on the 3-23-06 date. <br /> <br />Please let me know if you need further info. <br /> <br />Thanks <br /> <br />Roger Bussell <br />Project Manager <br />Harrison, Walker & Harper, LP <br /> <br />222 East Hickory Street <br />Paris, TX 75460 <br />ph (903) 785-1653 fax (903) 785-1608 <br />rbussell@webuild-hwh.com <br />o <br /> <br />I <br /> <br />---__ _____J <br /> <br />5/19/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.