My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 P&Z Report and Minutes
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2006
>
08 August
>
2006-08-14
>
03 P&Z Report and Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2006 10:31:24 AM
Creation date
8/8/2006 11:11:58 AM
Metadata
Fields
Template:
AGENDA
Item Number
03
AGENDA - Type
MINUTES
Description
Planning & Zoning Commission Report & Minutes
AGENDA - Date
8/14/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMORANDUM <br /> <br />TO: <br /> <br />Mayor and City Council <br />Planning and onn' Commission <br /> <br />Shawn Napier, . . <br />City Engineer ( ect r of Public Works <br /> <br />August 7, 2 6 <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Lamar Plaza <br /> <br />I have reviewed the preliminary plat of the above referenced addition. It appears that the <br />preliminary plat complies with the City of Paris subdivision regulations with the following <br />exceptions. <br /> <br />1. Show all trees 19-inches in diameter and larger. <br />2. Provide an inset in the top right comer with the current lot configuration. <br />3. Show the site as Block A, Lot l. <br />4. Label the wavy line going east and west. <br />5. Show the current zoning as general retail (GR). <br />6. Provide a dimension from the center of Lamar Ave. to the property line. <br />7. Add a five-foot utility easement along Lamar Ave. <br />8. Provide construction plans to the Engineering Department and Building plans to <br />Community Development. <br /> <br />I recommend approval of the preliminary plat upon completion of the above items. <br /> <br />cc: Tony N. Williams, City Manager <br />Lisa Wright, Director of Community Development <br />Brandon Chaney, P.E., R.P.L.S., Chaney Engineering Inc. <br />Donald Knight <br />
The URL can be used to link to this page
Your browser does not support the video tag.