My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13-A US 271 South Widening
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2007
>
02 February
>
2007 02-12
>
13-A US 271 South Widening
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2007 4:01:57 PM
Creation date
2/7/2007 3:57:33 PM
Metadata
Fields
Template:
AGENDA
Item Number
13-A
AGENDA - Type
REPORT
Description
TxDOT plans to widen Hwy 271 S. from Loop 286 to Co Rd 15400.
AGENDA - Date
2/12/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMORANDUM <br /> <br />DATE: <br /> <br />Ernie Clark, Interim City Manager <br /> <br />Shawn Napier, P.E. ~ Engineer / Director of Public Works <br />February 6, 2007 <br /> <br /> <br />TO: <br /> <br />FROM: <br /> <br />SUBJECT: U.S. 271 South Widening <br /> <br />The Texas Department of Transportation (TXDOT) has plans to widen U.S. 271 South, <br />from Loop 286 through Pattonville to County Road (CR) 15400. A location map is included that <br />shows the proposed construction area and the four typical sections. Also included is a detail of <br />typical section one and two. Typical section one shows a five lane section and typical section <br />two show a four lane divided section. The two sections will be transitioned just east of airport <br />road (F.M. 1508). The scheduled letting date is May 2009. <br /> <br />The first phase for TXDOT will be generating a working schematic (preliminary plan); <br />they hope to have this accomplished by August 2007. The next step will be preparing a Right- <br />of-Way (ROW) map; this will show all of the property owners and the amount of land that needs <br />to be purchased to widen the roadway. The ROW map will take approximately six months to <br />complete. The City of Paris will be responsible for 10% of the cost of purchasing new ROW. <br />TXDOT will estimate the ROW cost and give us a rough estimate of how much money we will <br />need to budget for this project. Given the current time line we would not need to budget the <br />money until the 2007-2008 budget. <br /> <br />Memo - TXDOT Hwy 271 South Widening 2-1-07 <br /> <br />r" . <br />
The URL can be used to link to this page
Your browser does not support the video tag.