My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-E Appr Phase II of Wastewater System Improvements Pine Mill & Loop
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2007
>
03 March
>
2007 03-26
>
08-E Appr Phase II of Wastewater System Improvements Pine Mill & Loop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2007 3:51:48 PM
Creation date
3/22/2007 1:54:14 PM
Metadata
Fields
Template:
AGENDA
Item Number
08-E
AGENDA - Type
RESOLUTION
Description
Approving Phase II of the Wastewater System Impro for the TxDOT Grade Separation at Pine Mill & Loop
AGENDA - Date
3/26/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF PARIS, TEXAS <br />CITY COUNCIL AGENDA REQUEST <br />MEETING DATE: 13-26-2007 <br /> <br />[8JAction D Discussion Dlnformation DRefer to: <br /> <br />SUBMITTED BY: <br /> <br />I Engineering Department <br /> <br />DESCRIPTION: <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, <br />TEXAS, AUTHORIZING AND APPROVING PHASE" OF THE WASTEWATER <br />SYSTEM IMPROVEMENTS FOR THE TEXAS DEPARTMENT OF <br />TRANSPORTATION PINE MILL ROAD AND LOOP 286 NE GRADE <br />SEPARATION PROJECT; MAKING OTHER FINDINGS AND PROVISIONS <br />RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. <br /> <br />BACKGROUND INFORMATION: <br /> <br />This pha~e " will complete the relocation of the 18-inch sewer main and allow <br />TXDOT to complete the installation of the storm sewer system for the project. At <br />least three known conflicts exist between our existing sanitary sewer main and the <br />proposed storm sewer system. This project will replace an existing eight-inch clay <br />tile sewer line that leaves Eastfield Estates Subdivision behind the Holiday Inn. <br />This project will also solve an odor problem that exists in the 3300 Block of <br />Northeast Loop 286. Phase I of the project consisted of laying 1,230 feet of 18- <br />inch sewer main to replace a portion of the existing clay-tile sewer main. This <br />project will be funded from the interest earned on required contingency reserves. <br /> <br />FISCAL AUTHORITY: <br />BUDGETED: <br />GRANT: <br />BOND / C 0 <br />Other: <br /> <br />Account #: <br />Account #: <br />Account #: <br /> <br />LEGAL REVIEW: <br /> <br />I <br /> <br />MANAGER'S RECOMMENDATION: <br /> <br />. - f <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.